12.5 Prefabricated Homes As with buildings constructed on site, the Customer shall obtain approval from the Supply Authority for the route of the utility supply conductors and the location of the service entrance for prefabricated homes (m...
AI summary The document outlines requirements for obtaining approval from the Supply Authority for the route of utility supply conductors and the location of the service entrance for prefabricated homes, such as modular and mini homes, constructed on specific building lots.
12.10 Service Entrances on Utility Poles Service entrances (no meters) shall only be permitted on utility poles as follows: - 1) Customer meters shall not be installed on any pole, notwithstanding items 5 and 6 below. - 2) Service entrance...
AI summary This section outlines the rules and standards for installing service entrances on utility poles in Nova Scotia. It specifies where service entrances can be installed, the required standards, and conditions for approvals. Key requirements include adherence to specific NSPI drawings and the use of PVC conduit or armoured cable with proper transitions.