Matter: Nova Scotia Power Inc. - 2026 Annually Adjusted Rates (AARs)
5 passages 5 documents

Electricity Generation across all matters →

N-1Application - Redacted 1 passage
2026 AAR Application Appendix A1 Page 5 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 47
2026 AAR Application Appendix A1 Page 5 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 5 of 5 (iv.) Generating facility shall meet all applicable safety and performance standards esta...

AI summary The document outlines requirements for generating facilities under the Generation Replacement and Load Following Tariff, specifying that they must comply with safety and performance standards set by Measurement Canada, the Canadian Electrical Code, and NSPI's interconnection guidelines.

N-5NSPI (NSEB) RIR 1 to 14 - Redacted 1 passage
REDACTED p. p. 6
REDACTED 1 sites, and new wind (two Rate Based Procurement sites and the PHP Wind farm). As shown 2 in the table below, this assumes Wreck Cove Unit #2 is unavailable at the beginning of 3 2026 but is in service at the end of the year, and...

AI summary The text discusses the inclusion of new energy generation and storage sites, including wind farms and Battery Energy Storage Systems (BESS), in the context of the availability of Wreck Cove Unit #2 and the commissioning of a third BESS facility by the end of 2026.

N-6NSPI (REI) RIR 1 to 20 - Redacted 1 passage
9.2 Other Generator Impact p. p. 94
9.2 Other Generator Impact In addition to other NS Power customers, the Electricity Act ,as amended, stipulates that existing independent power producers and approved feed-in-tariff producers (collectively "protected producers") should not...

AI summary The text discusses the impact of new generators on existing protected producers under the Electricity Act. It outlines two options for addressing potential adverse effects: physical protection through prioritizing curtailments or financial compensation from the RtR supply chain. The NS Power System Operator is tasked with implementing these processes in its Operating Procedures.

N-14Compliance Filing - Redacted 1 passage
Annual Peak of ATL 2,356,954 Annual Energy Requirement of ATL 11,303,785,142 p. p. 42
Annual Peak of ATL 2,356,954 Annual Energy Requirement of ATL 11,303,785,142 O- 4 0-! 4 1 1 F4 Purchased Power - Biomass Non-Wind Purchases $1,933,751 $3,023,273 $1,501,824 $2,810,809 $1,568,024 $3,357,425 $71,916 $1,846,185 $1,476,419 $3,...

AI summary The document presents data on energy and power purchases, including annual peak and energy requirements, with detailed breakdowns of costs for various sources such as biomass, wind, and COMFIT. It includes figures for different periods and categories of power generation and purchase.

100153Renewall (NSPI) IR 1 to 20 - WORD 1 passage
Section 4
l and Purchased Power Model.17 17 - 2025 PLEXOS AAR F&PP model is based on the 2024 Q3 forecast F&PP model, with updated system assumptions, including commodity pricing update as of 2024-08-16. 1. In stating the above, is NS Power saying i...

AI summary The text discusses the 2025 PLEXOS AAR F&PP model used by NS Power, with assumptions based on August 2024 data. It raises questions about model accuracy, data timeliness, and the identification of highest variable cost generators. The preamble also references economic dispatch and environmental legislation, as well as forecast accuracy assessments via FAM reporting.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →