Section 1149
the open market. In such instances the property may be acquired if no economically prac cal alterna ve property is available to sa sfy the requirements of the future project in ques on. Land Disposal NS Power can dispose of, lease or grant...

AI summary The document outlines NS Power's policies for land and asset management, including disposal of surplus land, buildings, and rights-of-way, while emphasizing environmental compliance. It also addresses capital planning and expenditure justification criteria for hydro, wind, and biomass assets.

Section 1154
genera on, o en at a higher cost than the exis ng genera on. These costs are es mated using the probabilis c produc on model and incorporated into the Economic Analysis Model. 17.8 System Design Nova Sco a Power’s transmission system is di...

AI summary Nova Scotia Power Inc. estimates generation costs using a probabilistic production model integrated into the Economic Analysis Model. The transmission system is classified into primary, secondary, and electrically remote categories with distinct design criteria. NS Power adheres to NPCC Directory #1 for bulk power system design, ensuring alignment with interconnected grid standards.

Section 1375
1 2 Through 2025, NS Power has made steady progress on the DERIR initiative. The initial 3 framework, first stakeholder workshop, development of list of DER-related initiatives, second 4 stakeholder workshop, and one-on-one interviews with...

AI summary NS Power has advanced the DERIR initiative through stakeholder engagement and planning, while exploring green hydrogen projects with developers like EverWind Fuels and Nova Sustainable Fuels. These projects require incremental resources beyond current load forecasts, highlighting the need for additional capacity and renewable energy integration.

N-6NSPI (NSEB) RIR 1 to 202 - Redacted 3 passages
2026 ACE Plan NSEB IR-7 Attachment 1 Page 1 of 1 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 7
2026 ACE Plan NSEB IR-7 Attachment 1 Page 1 of 1 REDACTED (CONFIDENTIAL INFORMATION REMOVED) CI# Project # Project Long Title Invesment Trigger Retire by 2030 POA C0080731 Steam POA Arrowhead Refurbishment 2026 Point Aconi Generating Stati...

AI summary The document outlines a list of projects under the 2026 ACE Plan, including refurbishments and upgrades at the Point Aconi Generating Station. Each project includes details such as investment triggers, project titles, and associated costs. The projects are scheduled to be retired by 2030.

NON-CONFIDENTIAL p. pp. 6-11
NON-CONFIDENTIAL 1 Request IR-81: 2 3 G04: C0068898 TUC1 IP LP Last Stage Blade Replacement 4 5 Please provide the forecast capacity factor and utilization factor for TUC1 for each year 6 from 2026 up to and including 2035. 7 8 (a) Given t...

AI summary The response to Request IR-81 discusses the forecast capacity and utilization factors for TUC1 from 2026 to 2035, citing figures from the 2025 10-Year System Outlook. It highlights that maintaining TUC1 beyond 2035 is the lowest-cost option for providing essential firm capacity and winter reliability, as outlined in the Evergreen Integrated Resource Plan.

8 (b) Please refer to the table below: p. p. 121
8 (b) Please refer to the table below: Ruth Falls Generation (Gross) - GWh 2021 2022 2023 2024 2025 Ruth Falls 1 5.35 3.17 12.37 6.73 3.61 Ruth Falls 2 5.64 5.35 7.83 7.09 5.87 Ruth Falls 3 7.03 7.37 15.89 7.67 5.66 Ruth Falls (Total) 18.0...

AI summary The table provides generation data for Ruth Falls 1, 2, and 3 from 2021 to 2025, including gross generation in GWh for each year.

N-7NSPI (SBA) RIR 1 to 29 1 passage
Natural Resources and Renewables Office of the Minister p. p. 35
Natural Resources and Renewables Office of the Minister PO Box 698, Halifax, Nova Scotia, Canada B3J 2T9 • Telephone 902-424-4037 • Fax 902-424-0594 • novascotia.ca January 16, 2024 Judith Ferguson Nova Scotia Power 1223 Lower Water Street...

AI summary The Minister of Natural Resources and Renewables directs Nova Scotia Power Inc. to provide equipment and systems to supply inertia response for wind energy conversion systems (WECS) procured under specific sections of the Electricity Act. This is to ensure the stability, reliability, and power quality of the transmission system.

100690NSEB (NSPI) IR 1 to 202 - PDF 1 passage
Preamble
- up to and including 2035. - a) Given these forecast capacity and utilization factors, please describe any work NS Power has undertaken to assess opportunities to continue operation of TUC1, or shifting of load to other generating facilit...

AI summary The document requests NS Power to describe any work undertaken to assess opportunities for continuing the operation of TUC1 or shifting load to other generating facilities, without requiring the proposed capital project, up to and including 2035.

100691NSEB (NSPI) IR 1 to 202 - Word 1 passage
Section 67
functions they perform. 2. Has the transfer of NS Power employees to the IESO Nova Scotia altered NS Power’s ongoing advisory role and the support it provides to the IESO Nova Scotia. Please explain. On page 680, NS Power states “NS Power...

AI summary The document discusses the transfer of NS Power employees to the IESO Nova Scotia and its impact on NS Power’s advisory role. It also addresses the timeline and cost implications of converting coal units to alternative fuels, including Heavy Fuel Oil (HFO) and natural gas, as outlined in the 2030 Clean Power Plan and the 2023 Evergreen IRP scenarios.

103410Decision 1 passage
Preamble p. p. 73
nuary 2026 is a good example of this. The BESS projects also allow flexibility in energy dispatch with the capacity to store low- cost or off-peak energy and use it during higher-cost on-peak periods. [198] Another component of The Path to...

AI summary The document discusses the NS-NB Reliability Intertie project, a second 345 kV transmission line between Nova Scotia and New Brunswick, and the retirement timeline for NS Power's coal-fired plants. It also mentions BESS projects and early-stage discussions about green hydrogen and offshore wind.

20260421-1Hearing Transcript — 04/21/2026 (Revised Transcript - Refiled May 20, 2026) 1 passage
NS POWER PANEL 185 Cr-ex, (Rudderham)
NS POWER PANEL 185 Cr-ex, (Rudderham) 1 was the 9th of October. Similar directive. 2 Q. I'm wondering if we can have a 3 copy of that as an undertaking in this proceeding. 4 A. (Pickles) Certainly. 5 THE CHAIR: So this is U-4, which is a 6...

AI summary The proceeding discusses the need for NSP to proceed with the Synchronous Condenser Project, citing directives from the Minister and cost-effectiveness analysis. NSP engaged external consultants to evaluate technologies, with synchronous condensers being the top recommendation due to the shift from traditional thermal assets to renewables.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →