First Pass – ISO-NE is provided with 600 MW of assistance. These shares are allocated equally, 200 MW each, among the other three participants. Second Pass – NYISO is provided 100 MW of assistance. These shares are allocated equally, 33 MW...
AI summary The document discusses the allocation of assistance shares among Balancing Authorities during a contingency, involving ISO-NE, NYISO, and PJM. It outlines the process of restoring the composite NPCC/PJM ACE and the impact on generation after the SAR procedure is canceled.
Appendix D – Guideline for Determining the Time T+0 The determination of time T+0 for resource losses is consistent with the methodology described in the NERC Performance Standard Reference Guide. For performing compliance evaluations, tim...
AI summary This appendix outlines the methodology for determining the time T+0 for resource losses, consistent with NERC standards. It involves using a sliding 60-second interval and evaluating changes in resource output against NPCC and DCS thresholds, with the DCS threshold taking precedence in case of discrepancies.