Matter: Northeast Power Coordinating Council (NPCC) - Fourth Quarter 2025 for Approval of Revised Regional Reliability Criteria
2 passages 1 document

Electricity Generation across all matters →

N-1Application - Directory 5 filing 2 passages
Section 160 p. p. 76
First Pass – ISO-NE is provided with 600 MW of assistance. These shares are allocated equally, 200 MW each, among the other three participants. Second Pass – NYISO is provided 100 MW of assistance. These shares are allocated equally, 33 MW...

AI summary The document discusses the allocation of assistance shares among Balancing Authorities during a contingency, involving ISO-NE, NYISO, and PJM. It outlines the process of restoring the composite NPCC/PJM ACE and the impact on generation after the SAR procedure is canceled.

Appendix D – Guideline for Determining the Time T+0 p. pp. 96-98
Appendix D – Guideline for Determining the Time T+0 The determination of time T+0 for resource losses is consistent with the methodology described in the NERC Performance Standard Reference Guide. For performing compliance evaluations, tim...

AI summary This appendix outlines the methodology for determining the time T+0 for resource losses, consistent with NERC standards. It involves using a sliding 60-second interval and evaluating changes in resource output against NPCC and DCS thresholds, with the DCS threshold taking precedence in case of discrepancies.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →