Matter: Nova Scotia Power Inc. - 2025 Annual FAM Report  (Fuel Adjustment Mechanism)
5 passages 3 documents

Electricity Generation across all matters →

N-1Annual FAM Report 2025 - Redacted 2 passages
Generation Unit Summary p. p. 2
Generation Unit Summary Plant Nameplate Capacity (MW) In Service Year Fuel Type 2025 Annual Energy (GWh) Lingan Unit 1 153 1979 Coal / Petcoke 692.5 Lingan Unit 2 148 1980 Coal / Petcoke 252.1 Lingan Unit 3 153 1983 Coal / Petcoke 644.4 Li...

AI summary The Generation Unit Summary table lists Nova Scotia's power plants with capacities, in-service years, fuel types (coal, petcoke, oil, natural gas, biomass, solar), and 2025 annual energy output. Total capacity is 2,421.2 MW, with 7,375.8 GWh annual generation, highlighting reliance on fossil fuels and emerging renewables like biomass and solar.

Plant Performance p. p. 2
Plant Performance DAFOR Q1 Q2 Q3 Q4 Annual Actual Annual Budget Prior Year Plant Lingan Unit 1 0.0% 8.0% 8.0% 8.3% 5.8% 5.7% 5.2% Lingan Unit 2 2.7% 0.0% 0.0% 0.0% 1.2% 6.8% 2.6% Lingan Unit 3 6.2% 0.0% 0.2% 4.4% 3.2% 4.5% 0.1% Lingan Unit...

AI summary The table presents DAFOR (Demand Availability Factor) performance metrics for various power plants across quarters and annually, comparing actual performance to budgeted targets and prior-year data. Key plants include Lingan, Tufts Cv, Pt Tupper, and Trenton units, with significant variations in performance, such as Tufts Cv Unit 5 exceeding its budget by 150%.

N-2NSPI (NESB) RIR 1 to 17 - Redacted 2 passages
Plant Performance p. p. 3
Plant Performance DAFOR Q1 Q2 Q3 Q4 Annual Actual Annual Budget Prior Year Plant Lingan Unit 1 0.0% 8.0% 8.0% 8.3% 5.8% 5.7% 5.2% Lingan Unit 2 2.7% 0.0% 0.0% 0.0% 1.2% 6.8% 2.6% Lingan Unit 3 6.2% 0.0% 0.2% 4.4% 3.2% 4.5% 0.1% Lingan Unit...

AI summary The table presents DAFOR (Equivalent Forced Outage Time / Total Operating Time) metrics for multiple power plants across quarters and annual periods, comparing actual performance to budgets and prior years. Metrics highlight variability in plant reliability, with some units showing significant deviations from budgeted performance.

REDACTED p. p. 3
REDACTED 1 Request IR-8: 2 3 Reference: Tab A6(2) 4 5 In rows 7-26, 11 out of 15 generating units had actual Heat Rates (column G) that were 6 than budgeted (column H). What is NSPI's view of the cause(s) of these results? 7 8 Response IR-...

AI summary NSPI explains that forecasted heat rates differ from actuals due to dynamic operational factors like real-time dispatch, cycling, and fuel quality variations. Adjustments from prior years' coal pile surveys also impact current heat rates, even if they relate to previous periods.

101683NSEB (NSPI) IR-1 to IR-17 - Redacted 1 passage
Request IR-4:
Request IR-4: - Reference: Tab A2NC - a) In cell F9, please explain the ~55% increase in output at Lingan 2, relative to 2024. - b) Is the overall reduction in gas production and increase in solid fuel production relative to 2024 due to th...

AI summary The text includes three questions from Request IR-4, asking for explanations regarding increased output at Lingan 2, changes in gas and solid fuel production linked to SO2 certificate of variance, and discrepancies in hydro capacity figures between noted and reported values in the 2025 system outlook.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →