Section 2545
Recommends RPF to determine cost of new wind to system. 2020-11-13; p. 1/8 Work should fully consider alternative operational strategies 2020-11-13; p. 6/8 SBA SBA: Supports 2020-09-18; p. 2/3 4. Create a Demand Response Strategy targeting...

AI summary The text recommends developing a Demand Response Strategy targeting 75 MW of capacity by 2025, linked to the Electrification Strategy. It mentions leveraging existing initiatives like NS Power’s Smart Grid Project, Time Varying Pricing, and the ELIADC tariff. The SBA supports the strategy but suggests further examination of cost potential.

Section 2597
Request / Directive Originator Status NS Power Comments Recommendation XIV-5: NSPI should perform a standalone Bates White n/a Biomass as a component of the renewable analysis to determine the value of the Biomass Plant to FAM electricity...

AI summary Bates White recommended that NSPI perform an analysis to determine the value of the PH Biomass Plant to FAM customers, considering its operation without PHP load. NSPI accepted the recommendation and planned to incorporate the analysis into the 2019 IRP. The Board later approved the ELIADC tariff, removing PHP’s explicit access to the biomass plant’s generation.

Section 2598
g term as a part of the integrated system in Nova Scotia.”701 Subsequently, the Board approved the ELIADC tariff, which eliminates PHP’s explicit option to access generation from the biomass plant. 12

AI summary The document discusses the elimination of PHP's explicit option to access generation from the biomass plant through the approved ELIADC tariff, which is part of the integrated system in Nova Scotia.

N-10Comments - Bates White 2 passages
Section 18
o NSPI’s firm peak load “and are not included in the firm peak load demand forecast in the IRP;” thus, “these customers do not impact capacity planning requirements in the long-term resource plans.”30 We recognize that the landscape has sh...

AI summary NSPI's firm peak load is excluded from the IRP's demand forecast, impacting capacity planning. The audit considers its recommendation closed due to the defunct LRT and ELIADC Tariff's role in preventing PHP contributions to peak load, though ELIADC's effectiveness remains unproven. A separate recommendation urges NSPI to evaluate full costs and benefits of maintaining its existing generating assets, including environmental and decommissioning factors.

Section 22
e Margin and Capacity Value Study,” July 2019. 37 Audit Report, Recommendation IX-1. 12 Bates White Comments On NSPI Final IRP Report Recommendation XIV-5: NSPI should perform a standalone analysis to determine the value of the Biomass Pla...

AI summary The text recommends NSPI conduct a standalone analysis to assess the Biomass Plant's value to FAM customers without PHP load, ensuring FAM customers aren't burdened by costs tied to PHP load. It also highlights the need for economic evaluation of NSPI's diesel-fired combustion turbines.

N-18Response to Comments - NSPI 2 passages
B. Recommendation XIV: Biomass Plant Value Analysis p. p. 9
B. Recommendation XIV: Biomass Plant Value Analysis NSPI should perform a standalone analysis to determine the value of the Biomass Plant to FAM customers, looking forward, in the absence of PHP load. Such a study would establish whether a...

AI summary NSPI is recommended to conduct a standalone analysis of the Biomass Plant's value to FAM customers without PHP load, determining if costs are incremental to PHP load and how to shield FAM customers from these costs. The analysis is compared to the ELIADC Tariff, with concerns that FAM customers should not bear costs tied to indefinite PHP load continuation.

IRP Final Report Comments – Bates White p. p. 13
3 Biomass Plant General / other Value analysis – Similar to our discussion of PHP's new ELIADC Tariff with NSPI, we understand NSPI's position that under the ELIADC, PHP imposes no inc

AI summary The text references a discussion about the ELIADC Tariff and NSPI's position regarding biomass plant general/other value analysis. It mentions similarities to a prior discussion involving PHP and NSPI.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →