HomeEliadc TariffM12451Evidence
Topic/Matter Intersection

Topic:"Eliadc Tariff" in M12451

Matter: Nova Scotia Power Inc. - 2026 General Rate Application (GRA)
19 passages 8 documents

Eliadc Tariff across all matters →

N-132026-2027 GRA OE-01-13 - Redacted 2 passages
Nova Scotia Power Inc. NSPI (FAM) M-7 Monthly FAM Reporting NON CONFIDENTIAL Volume and Pricing Summary For the Period Ended Month, Day, Year p. p. 7
Nova Scotia Power Inc. NSPI (FAM) M-7 Monthly FAM Reporting NON CONFIDENTIAL Volume and Pricing Summary For the Period Ended Month, Day, Year Category Variance from Budget Details Total Fuel and Purchased Power Expense Total System Require...

AI summary The document presents a summary of Nova Scotia Power Inc.'s monthly FAM reporting, including variance from budget and forecast for fuel and purchased power expenses, as well as details on revenue and accruals related to the ELIADC Tariff.

PC - Petcoke p. p. 42
PC - Petcoke Nova Scotia Power Inc. NSPI (FAM) Q-13 Quarterly FAM Reporting PARTIALLY CONFIDENTIAL ELIADC Tariff Revenue For the Period Ended Month, Date, Year QTD Month $ QTD Month MWH ELIADC in Monthly FAM Report (reported on M1) Adjustm...

AI summary The text provides a table related to Nova Scotia Power Inc.'s Fuel Adjustment Mechanism (FAM) reporting, including ELIADC Tariff Revenue and various charges and adjustments for a specific period. It includes categories such as CBL Energy Charge, Variable Operating Charge, and Fixed Cost Recovery.

N-27NSPI (NSEB) RIR 1-152 - Redacted (settlement agreement attached at IR-1) 1 passage
Preamble p. pp. 107-148
- In addition to mass-market rate design initiatives such as TVP, NS Power continues to administer - the Extra Large Industrial Active Demand Control (ELIADC) Tariff as a targeted solution for its - largest customer, Port Hawkesbury Paper...

AI summary NS Power administers the ELIADC Tariff for its largest customer, Port Hawkesbury Paper, and continues to engage stakeholders on rate design initiatives. While the 2026-2027 General Rate Application does not propose new rate design concepts, NS Power remains committed to evolving rate structures. References are made to a related proceeding (M12184).

N-67Response to Undertaking U-4 - Combined Redacted Only 2 passages
REDACTED 2026-2027 GRA U-4 Attachment 2 Page 93 of 99 NOVA SCOTIA POWER INC. DETAILED LISTING OF C.O.S.S. INPUT INFORMATION FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS)
REDACTED 2026-2027 GRA U-4 Attachment 2 Page 93 of 99 NOVA SCOTIA POWER INC. DETAILED LISTING OF C.O.S.S. INPUT INFORMATION FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) (075) TOTAL DEVENUE OF ATL DATE OF ACCES ELIADC ELI...

AI summary The document provides a detailed listing of C.O.S.S. input information for Nova Scotia Power Inc. for the year ending December 31, 2027, including a line item related to ELIADC (Energy Load and Intermittency Adjustment and Demand Control) with a value of 1,012.5 thousand dollars.

FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS)
FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) Calendar Month of System Peak 1 January February March April May June July August September October November December Total (14) MWH SALES -ELIADC 49,266 47,174 49,718 46,267...

AI summary The document provides a summary of MWH sales under the ELIADC tariff for each month from January to December 2027, with a total of 506,264.4 MWH sold for the year.

N-74Response to Undertaking U-2 1 passage
NON-CONFIDENTIAL
NON-CONFIDENTIAL 1 Undertaking U-2: 2 3 To provide a response to Board IR-130(e), which is to calculate a forecasted deferral amount 4 to be charged to customers if PHP remains on the ELIADC for all of 2026 5 6 Response U-2: 7 8 Please ref...

AI summary The response to Board IR-130(e) calculates a forecasted deferral amount of $18.2 million if PHP remains on the ELIADC Tariff for all of 2026, along with a $5.7 million fuel balance under the FAM. These calculations are based on the 2026 AAR ELIADC Tariff and GRA ATL PHP Tariff, assuming PHP load in 2026 matches the 2026-2027 GRA assumptions.

N-92Compliance Filing - Standardized Filings - Redacted 8 passages
Section 133
ME POWER LOAD FOLL. ELIADC BUTU SPILL PRICING EBS RTR OATT TOTAL BTL

AI summary The text presents a table with various columns related to power, load, and energy management, including terms such as ELIADC, BUTU, SPILL, PRICING, EBS, RTR, and OATT, which are likely related to energy systems and market operations.

Section 314
BELOW-THE-LINE CLASSES (14) SHORE POWER NA NA 1.000 NA NA 1 NA NA - NA NA - 1 0 1 1 0 1 (15) GEN.REPL./LOAD FOLL. NA NA 1.000 NA NA - NA NA - NA NA - - - - - - - (16) ELIADC NA NA 1.000 NA NA - NA NA - NA NA - - - - - - - (17) BUTU NA NA 1...

AI summary The text presents a table with various below-the-line classes, including Shore Power, GEN.REPL./LOAD FOLL., ELIADC, BUTU, REAL TIME PRICING, and OATT, along with numerical data and labels. It appears to be a financial or operational classification table, possibly related to regulatory reporting.

Section 359
1,232,987 2,631,643 79.6% 2,094,930 12.51% 2,356,954 70.31% (12) SHORE POWER (13) GEN.REPL./LOAD FOLL. (14) ELIADC (15) BUTU (16) REAL TIME PRICING (17) EBS/RTR (17) SUB-TOTAL 10,986 17.0% 11,335 89,676 182.9% 53,819 18.52% 56,516 0.00% (1...

AI summary The document presents a table of sales, generation, and demand analysis for February 2026, including various categories such as Shore Power, Generation Replacement, ELIADC, and Real Time Pricing. It also includes a sub-total and total before export, with some data redacted as confidential information.

Section 368
926,921 1,855,297 84.4% 1,566,369 8.06% 1,692,632 76.06% (12) SHORE POWER (13) GEN.REPL./LOAD FOLL. (14) ELIADC (15) BUTU (16) REAL TIME PRICING (17) EBS/RTR (17) SUB-TOTAL 11,281 16.2% 11,623 73,291 200.6% 48,832 15.77% 50,740 0.00% (18)...

AI summary The text provides a table with data on sales, generation, and demand analysis for May 2026, including figures related to various energy-related components such as Shore Power, Generation Replacement/Load Following, and ELIADC. It also includes a reference to a redacted compliance filing related to the 2026-2027 General Rate Adjustment (GRA).

Section 467
0.000 (390) RTR TRANS 3,400.180 3,400.180 0.000 (391) RTR DIST 6,673.861 6,673.861 0.000 (392) RTR RETAIL 737.648 19,835.4 737.648 19,835.4 0.000 (393) Total 24,694.546 (0.000) 24,694.546 24,694.5 0.000 0.0 (394) (395) TOTAL REVENUE OF BTL...

AI summary The text presents a table with various revenue and cost entries, including line items such as 'RTR', 'DIST', 'RETAIL', and 'ELIADC', along with numerical values and some references to programs and systems like 'OATT' and 'EBS'. The data seems to be related to regulatory financial reporting.

Section 501
15,951.7 (161) Distribution BP Substation - Municipal - (162) Distribution Primary Voltage - LIR 111,061.6 Distribution Primary Voltage - Municipal 45,013.2 ELIADC - MWh Loss Factor 2.5% 2.5% 2.6% 2.4% 2.3% 2.3% 2.2% 2.1% 2.3% 2.3% 2.5% 2....

AI summary The document contains a reference guide for a 2027 Cost of Service Study Analysis by Nova Scotia Power Inc., including a redacted compliance filing related to GRA (Grid Reliability and Availability) for 2026-2027. It includes data on distribution costs and loss factors related to ELIADC (Electric Load and Infrastructure Analysis and Development Corporation).

Section 792
71 6,148 15,369 21,517 0 - 0 229 - 229 11,447 10,299 21,746 12,146 10,927 23,073 BELOW-THE-LINE CLASSES (14) SHORE POWER NA NA 1.000 NA NA 1 NA NA 0 NA NA 0 1 1 1 1 1 1 (15) GEN.REPL./LOAD FOLL. NA NA 1.000 NA NA - NA NA - NA NA - - - - -...

AI summary The text presents a table with numerical data and categories, including entries for 'SHORE POWER', 'GEN.REPL./LOAD FOLL.', 'ELIADC', 'BUTU', and 'REAL TIME PRICING', with most values listed as 'NA' or '0'.

Section 939
DIST 20.5 20.5 0.000 (376) SHORE POWER RETAIL 5.0 37.06 5.0 37.1 0.000 0.0 (377) GEN.REPL./LOAD FOLL. PROD (112.3) (112.3) 0.000 (378) GEN.REPL./LOAD FOLL. TRANS - - 0.000 (379) GEN.REPL./LOAD FOLL. DIST - - 0.000 (380) GEN.REPL./LOAD FOLL...

AI summary The text presents a table with various line items and associated values, including entries related to shore power, generation replacement, load follow, and ELIADC and BUTU activities across different sectors such as production, transmission, distribution, and retail. The table includes both positive and negative values, indicating financial flows or adjustments.

100780Closing Submission - NSPI 1 passage
3.7.2 Outcome of PHP remaining below-the-line One of the concerns raised during the hearing was the potential impact on the GRA if PHP does not ultimately take service under an above-the-line tariff in 2027, and what alternative arrangements might apply.[59](#page-33-2) The NS Power panel explained that while the precise alternative would depend on the circumstances, PHP would necessarily take service either below-the-line or above-the-line, and NS Power would work to ensure that an appropriate arrangement is in place when the current ELIADC Tariff expires at the end of 2026.[60](#page-33-3) If PHP elects not to take service under the new ELIDT, then it is expected that the existing ELIADC Tariff would form the baseline for any required true-up calculation for as long as it remains in place. [61](#page-33-4) 12 However, to the extent that an entirely different tariff (i.e. not the ELIDT or the ELIADC) is in place at some point during the 2026-2027 period, then it is expected that tariff would then form the baseline. To help illustrate the potential magnitude of the impacts in this scenario, NS Power indicated at Exhibit 74 (Undertaking-2), that the forecast PHP Deferral amount, if PHP remains on the ELIADC Tariff for all of 2026, would be anticipated at $18.2 million. In addition, a fuel balance amount of approximately $5.7 million is anticipated to be recorded under the FAM.[62](#page-33-5) 3.7.3 Criticality of the PHP Deferral In light of the acknowledged uncertainty regarding PHP's ultimate tariff treatment in the test period, the changes in load caused by the onset of the Goose Harbour Lake wind project, and the likely material magnitude of the associated revenue and cost impacts, the need for a deferral mechanism is both evident and prudent.[63](#page-33-6) As noted by Bates White in its evidence, given the p. p. 35
, which is to proceed on the basis of the COS as proposed and to continue to evaluate whether the Minimum System Method remains the most appropriate method for Nova Scotia. She also advocated for consideration of a load Exhibit N-37, Synap...

AI summary The text discusses the potential impact on the GRA if PHP does not take service under an above-the-line tariff in 2027, and outlines alternative arrangements. It also notes the criticality of deferring certain costs and revenues, with a forecasted PHP Deferral amount of $18.2 million if PHP remains on the ELIADC Tariff for all of 2026.

20260107-1Hearing Transcript — 01/07/2026 (Willett, Williams, Flemming, MacIntosh, Blair) 3 passages
OPENING STATEMENT 59 NSP COST OF SERVICE PANEL
OPENING STATEMENT 59 NSP COST OF SERVICE PANEL 1 We know that there is never a good 9 customer starting January 1. Can you just confirm that's 10 the assumption in the current Cost-of-Service Study filed? 11 A. (Willett) Correct. 12 And cu...

AI summary The discussion focuses on the assumptions in the current Cost-of-Service Study and the ELIADC tariff, which PHP is currently under and will transition from by the end of 2026. The ELIADC tariff extension to 2026 is confirmed, and there is a reference to the Above-the-Line Application under Matter M12661.

Section 70
the-line Cost-of-Service Study that would form the basis of a true-up calculation in the deferral? A. (Williams) The basis for that true-up would be the ELIADC, the tariff that PHP is currently taking service on. MS. RUDDERHAM: Mr. Goodine...

AI summary The discussion revolves around the basis for a true-up calculation in the deferral, referencing the ELIADC tariff and NSPI's responses to NSEB IRs, specifically IR-130 subsection (e), which provides estimates of deferred amounts by month if PHP does not take service under the above-the-line tariff in the test years.

BY MS. RUDDERHAM:
BY MS. RUDDERHAM: 1 Q. I'll just read it into the record 2 starting at line 9. It says: 3 4 5 6 7 8 9 10 11 12 13 14 In order to provide a credible monthly forecast of the PHP Deferral, [NSPI] would need to know the corresponding alternati...

AI summary The discussion revolves around the need for a credible monthly forecast of the PHP Deferral, which depends on knowing the alternative rate under which PHP would take service. The true-up would be based on the ELIADC tariff, and there is uncertainty around calculating the forecasted deferral amount if PHP remains on the current rate through 2026 or 2027.

20260108-1Hearing Transcript — 01/08/2026 (Pecurica, Willett, Williams, Flemming, Coyne) 1 passage
Section 184
1 that type of thing, and those may be incremental charges 2 that we don't need to include in a deferral, but I think 3 there's just my hesitation to say that it's an 4 exhaustive list is just we need to let the process play 5 out and unde...

AI summary The discussion revolves around the ELIADC tariff and the $10,000 per month customer charge on the ELID, clarifying whether it is modelled in the GRA or proposed in the Application. There is a focus on understanding cost differences under various scenarios.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →