Matter: Nova Scotia Power Inc. - 2025 Short Run Marginal Cost (SRMC) Test to Rates Report
2 passages 2 documents

Eliadc Tariff across all matters →

N-1Report 1 passage
2 ELIADC p. p. 17
2 ELIADC 3 4 7 10

AI summary The document section labeled '2 ELIADC' contains minimal text, including page numbers and a figure reference. No substantive content or arguments are present in the provided text.

N-2Report - Refiled 1 passage
The SRMC test involves the following steps: 1. Determine the average annual system marginal cost (over 8760 hours in 2025) at the transmission delivery level. In calculating this marginal cost, the effects of exports and load served under the Extra Large Industrial Active Demand Control (ELIADC) Tariff, the successor to the LRT, are removed from the net system load. The 2025 marginal cost of 9.478 cents per kilowatt hour is calculated based on the fuel, incremental heat rate, and variable operating and maintenance (O&M) costs of the unit serving the next megawatt (MW) for each hour.[4](#page-8-1) 2. Determine the average annual marginal cost at the point of consumption of each tested rate class by increasing the average system marginal cost at the transmission level by the p. pp. 7-8
The SRMC test involves the following steps: 1. Determine the average annual system marginal cost (over 8760 hours in 2025) at the transmission delivery level. In calculating this marginal cost, the effects of exports and load served under...

AI summary The SRMC test calculates the system marginal cost at the transmission level and compares it to the unit revenue of each rate class. The test involves adjusting for the effects of exports and the ELIADC Tariff, and determining whether rate classes fail based on their revenue relative to marginal costs.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →