HomeEmergency ResponseM03514Evidence
Topic/Matter Intersection

Topic:"Emergency Response" in M03514

Matter: CI# 39663 - P-510 - NSPI WO - TRE5 - U&U Turbine Governor Refurbishment - $648,220
3 passages 1 document

Emergency Response across all matters →

N-1Redacted Work Order 9/2/2010 3 passages
NSPI, TRENTON G.S., Unit 5, MC 3902 - EMERGENCY OUTAGE 0 RAH CO PY p. p. 9
NSPI, TRENTON G.S., Unit 5, MC 3902 - EMERGENCY OUTAGE 0 RAH CO PY

AI summary The document pertains to an emergency outage at NSPI's Trenton Generating Station Unit 5, referenced under matter number MC 3902. It indicates a regulatory proceeding related to the outage event.

EMERGENCY OUTAGE p. p. 9
EMERGENCY OUTAGE CUSTOMER: Nova Scotia Power Inc. LOCATION: Trenton G.S. ORDER No: 278 UNIT No: 5 M·C: 3902 PERIOD OF CONTRACT: REPORTOY: APPROVED BY: Engineering Manager DlSmIBlJIlON: (2 Copies) (2 Copies) (1 Copy)

AI summary Document details an emergency outage report for Nova Scotia Power Inc. at Trenton G.S., including order/unit numbers and approval by the Engineering Manager. No explicit arguments or cross-references are discussed.

NSPI, TRENTON G.S., Unit 5, Me 3902 - EMERGENCY OUTAGE 0 RA H CO PV p. p. 9
NSPI, TRENTON G.S., Unit 5, Me 3902 - EMERGENCY OUTAGE 0 RA H CO PV - With the gauge rods, the main and auxiliary were set at 3600 rpm and the pilot oil regulating valve set. The machine was then loaded to 60 megawatts and a trip initiated...

AI summary This document details an emergency outage test at NSPI's Trenton G.S., Unit 5, Me 3902. The test involved setting gauge rods, loading the machine to 60 MW, and initiating a trip, resulting in the inner bolt tripping at 3965 rpm without unusual speed increases.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →