CI 50518 CA IR-5 Attachment 11 Page 15 of 34 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Sheet Harbour Hydro System Ruth Falls Dam Sluice Gate Installation Project and Environmental Description water is expected, NS Power will notify the c...
AI summary The document outlines NS Power's contingency measures for managing water flow during the Sheet Harbour Hydro System Ruth Falls Dam Sluice Gate Installation Project. It describes actions such as removing bridges, using excavators, and adjusting access roads to manage water levels during storm events and potential flood conditions.