Section 247
26 Consistent with prior years, NS Power has the following capital programs for storm response and 27 reactive work for 2026: 28 29 • D008 – Provincial Storm Distribution 30 • T001 – Transmission Line Unplanned Date: December 12, 2025 Page...

AI summary NS Power's 2026 ACE Plan includes capital programs for storm response and reactive work, such as D008 and T001. The plan highlights investments in vegetation management and references routines T010 and D010, as well as work order CI C0080266. The 2025 storm performance data is compared to previous years, showing the frequency and impact of significant weather events on system performance.

Section 1451
4 4.1 Wildfire Mitigation 5 6 NS Power actively engages with wildfire risk stakeholders across Nova Scotia to inform and 7 prioritize reliability and vegetation management initiatives. As part of NS Power’s Wildfire 8 Mitigation Plan, whic...

AI summary NS Power collaborates with stakeholders on wildfire mitigation, including community-specific risk assessments and accelerated vegetation management. In 2025, 11 km of rights-of-way management was prioritized in Glen Haven and Grand Lake, while emergency resources were deployed during the Long Lake wildfire to remove fire-compromised trees.

N-6NSPI (NSEB) RIR 1 to 202 - Redacted 18 passages
7.6 Emergency Services Accessibility p. p. 42
7.6 Emergency Services Accessibility Emergency Response Services mobility must be preserved at all times. Operating Routes must be reviewed on a regular basis to ensure that access is maintained at all times. Alternative and approved route...

AI summary Emergency Response Services mobility must be preserved at all times. Operating Routes must be reviewed regularly to ensure access is maintained. Alternative routes should be established if new construction threatens access areas.

Lightning Storms p. p. 54
Lightning Storms - − Shutdown equipment and processes - − During the electrical storm, work activity around the operation should be temporarily stopped until the danger has passed

AI summary The document outlines safety protocols during lightning storms, emphasizing the shutdown of equipment and temporary cessation of work activities until the danger has passed. The focus is on operational safety measures to mitigate risks associated with electrical storms.

In the case of a hurricane/tropical storm watch or warning p. p. 54
In the case of a hurricane/tropical storm watch or warning Gather loose construction materials in organized piles and secure them with ropes, zip-ties, and duct-tape, making them more difficult to blow away. Construction equipment and mate...

AI summary The document outlines safety measures for securing construction materials and equipment during hurricane or tropical storm watches/warnings, including using ropes, storing items away from coastal zones, employing ground anchors, covering materials with tarps, and properly disposing of waste to prevent damage and environmental hazards.

Project Health & Safety Plan p. p. 61
Project Health & Safety Plan Tufts Cove Shoreline Sheet Pile Rock Revetment RFP-06/2025-545 - − Training of construction staff and subcontractors regarding proper methods for transporting, transferring, and handling substances that have th...

AI summary The Project Health & Safety Plan outlines measures for training, SOPs, hazardous material handling, and emergency protocols for the Tufts Cove Shoreline project. It emphasizes mechanical integrity checks, secondary containment, SDS availability, and spill risk analysis. Dexter will coordinate reporting to DEPP.

13.4 Site Clearing and Plant Protection p. p. 63
13.4 Site Clearing and Plant Protection - 1) Protect trees, plants and foliage on site and adjacent properties where indicated. - 2) Protect roots of designated trees to dripline during excavation and site grading to prevent disturbance or...

AI summary The section outlines safety protocols for site clearing and plant protection, including measures to protect vegetation, prevent brush fires through equipment use, fire watch requirements, fire extinguisher maintenance, and the necessity of a Dexter Hot Work Permit for hot work activities.

15.0 Emergency Preparedness and Response p. p. 67
15.0 Emergency Preparedness and Response

AI summary The document section titled '15.0 Emergency Preparedness and Response' is introduced, though no substantive content or discussion is provided in the text chunk. The heading indicates a focus on emergency planning and response mechanisms, but details are absent.

15.1 Purpose p. p. 67
15.1 Purpose A site-specific emergency response plan will be developed and communicated to all workers on the site. The plan will contain all appropriate actions, required contact numbers, proper notification protocol and muster station lo...

AI summary The document outlines requirements for developing and communicating site-specific emergency response plans, ensuring worker training in emergency preparedness, first aid, and fire extinguisher use. It mandates distribution of the plan, worker familiarity with procedures, and adherence to the Incident Notification Process during emergencies at MGOC work sites.

15.2 Emergency Planning p. p. 67
15.2 Emergency Planning Assessing Risk: First, all potential emergencies must be evaluated to determine the level of planning required based on risk. If high-risk work is being conducted, additional planning will be required including trai...

AI summary The document outlines emergency planning requirements, including risk assessment, employee training (e.g., WHMIS, fire awareness), specific training for high-risk tasks, designated muster points, ERP communication, testing protocols, and the role of Emergency Coordinators in evacuation procedures.

Types of Emergencies p. p. 67
Types of Emergencies Fire: In the event of a fire, employees must evacuate the area immediately. If employees are trained and confident that the fire is small enough to contain, employees can extinguish the fire with available and appropri...

AI summary The text outlines fire emergency procedures, requiring immediate evacuation unless employees are trained to safely extinguish small fires using available extinguishers and then call for assistance.

Project Health & Safety Plan p. p. 68
Project Health & Safety Plan Tufts Cove Shoreline Sheet Pile Rock Revetment RFP-06/2025-545 emergency services) prior to attempting to fight any fire themselves. If the fire is too large to extinguish, Emergency Services 911 or other Emerg...

AI summary The Project Health & Safety Plan outlines protocols for emergency response, medical incidents, transportation to medical facilities, accident management, spill containment, and workplace violence prevention. It emphasizes immediate notification of emergency services, proper first aid administration, spill reporting to environmental authorities, and adherence to workplace violence policies.

First Aid Kits, eye wash and fire extinguishers are located (Mark X if available) : p. p. 69
First Aid Kits, eye wash and fire extinguishers are located (Mark X if available) : Location FA Kits Eye Wash Fire Extinguisher Supervisor vehicle / trailer YES YES YES Employees onsite certified in Emergency First Aid: Employee Name Conta...

AI summary The document outlines requirements for emergency equipment such as first aid kits, eye wash stations, and fire extinguishers, specifying their locations and availability. It also mentions the need for employees certified in Emergency First Aid and provides a section for emergency contact information.

Halifax Water: 902-420-9287 Nova Scotia Power: 1-877-428-6004 Rogers: 1-888-764-3771 p. p. 70
Halifax Water: 902-420-9287 Nova Scotia Power: 1-877-428-6004 Rogers: 1-888-764-3771 Emergency Authorities Contacts Organization Location Phone Number Police Nova Scotia 911 Ambulance Nova Scotia 911 Fire Department Nova Scotia 911 Poison...

AI summary This section discusses fire protection and prevention, highlighting the importance of emergency response and safety measures. It includes contact information for various emergency services in Nova Scotia.

15.8 Emergency Equipment p. p. 73
15.8 Emergency Equipment Fire Extinguishers: There must be portable fire extinguishers available at each facility and field site, as well as inside all MGOC vehicles. Fire extinguishers are required to be inspected monthly (internally) as...

AI summary The section outlines requirements for fire extinguishers and first aid kits, including placement, inspection, accessibility, and training. Fire extinguishers must be inspected monthly and annually, while first aid kits must comply with provincial/federal legislation. Staff training and incident reporting protocols are emphasized.

15.9 Communication p. p. 74
15.9 Communication Communication during an emergency is vital to emergency response time. The time it takes to evacuate and/or for assistance to arrive can affect the outcome of the emergency. Devices play a significant role as they are th...

AI summary Effective emergency communication is critical for timely response and evacuation. Fixed facilities use alarm systems and direct lines, field sites rely on air horns and radios, and commercial vehicles utilize various communication tools to ensure employee safety during emergencies.

15.10 Emergency Contact p. p. 74
15.10 Emergency Contact Emergency Contacts: Emergency contact list should include names and contact information of First aid providers and Managers/Supervisors. Emergency contact lists must be posted where possible in prominent areas or av...

AI summary The document outlines requirements for emergency contact lists, including first aid providers and supervisors, which must be posted in visible areas. It also mandates communication of directions to nearby medical facilities and provision of physical addresses for fixed and field sites. A sample document is shared with workers via Toolbox Meetings and made available onsite.

Responding to an Incident p. p. 82
Responding to an Incident If an incident occurs, it is very important to respond promptly to reduce the risk of further loss – this must become the priority. Preventing further injury and protecting property that may be endangered because...

AI summary The document outlines immediate response procedures for incidents, emphasizing prompt action to prevent further harm, administering first aid, contacting emergency services, preserving evidence, and delaying clean-up until investigation is complete.

Appendix A – Emergency Route to Nearest Medical Facility p. p. 91
Appendix A – Emergency Route to Nearest Medical Facility To: Dartmouth General Hospital – 322 Pleasant St, Dartmouth, NS From (Project Site): Tufts Cove Generating Station – 315 Windmill Rd, Dartmouth, NS - 1. Head northwest toward Windmil...

AI summary Appendix A provides an emergency route from Tufts Cove Generating Station to Dartmouth General Hospital, detailing a 6-step navigation path with specific road directions and distances. The document includes a figure reference for visual aid.

2026 Annual Capital Expenditure (ACE) Plan (NSEB M12619) NSPI Responses to NSEB Information Requests p. p. 154
2026 Annual Capital Expenditure (ACE) Plan (NSEB M12619) NSPI Responses to NSEB Information Requests 1 (f) This project will be completed leveraging both internal resources and specialized external 2 consultants and contractors. 3 4 The al...

AI summary NSPI explains that the 2026 ACE Plan project will use both internal and external resources due to the specialized nature of the work and resource constraints. The response also mentions the deployment of remote terminal units (RTUs) for quick emergency disconnection of power.

103410Decision 1 passage
2.2.4 C0080111 – 2026 RTU Deployment p. pp. 12-14
2.2.4 C0080111 – 2026 RTU Deployment [28] This project will install 21 new Remote Terminal Units (RTU) in substations throughout Nova Scotia over the next three to four years. The RTU and telecom will be installed at substations that curre...

AI summary This project involves the installation of 21 new Remote Terminal Units (RTU) in Nova Scotia substations over the next three to four years. The RTUs will improve system visibility and remote operability, enabling faster emergency response and outage resolution. The project aligns with NS Power's Advanced Grid Modernization program and its Five-Year Reliability Plan goals.

100705CA (NSPI) IR 1 to 32 - PDF 1 passage
21 Request IR-28:
21 Request IR-28: 22 23 With respect to Appendix G, Section 5.3 and Exhibit N-7, RIR-12 in M12012: 24 25 a) Is NS Power a member of Grid Assurance's sparing service program or any other program 26 to subscribe to that allows for immediate...

AI summary The document contains a regulatory inquiry requesting Nova Scotia Power to clarify its participation in Grid Assurance's sparing service program and similar programs that provide access to spare transmission equipment in emergencies.

20260421-1Hearing Transcript — 04/21/2026 (Revised Transcript - Refiled May 20, 2026) 1 passage
NS POWER PANEL 349 Cr-ex, (Mahody)
NS POWER PANEL 349 Cr-ex, (Mahody) 1 2 3 4 5 6 7 At sites without remote monitoring and control, the system operator would normally have to dispatch a field crew to manually pull fuses or open switches. As referenced in the application, th...

AI summary The text discusses the response time for dispatching field crews to de-energize conductors due to safety concerns, highlighting the potential for longer outages if manual intervention is required instead of remote control. It also raises the question of Nova Scotia Power's target response time for such situations.

20260422-1Hearing Transcript — 04/22/2026 (Revised Transcript - Refiled May 20, 2026) 1 passage
Section 141
nowable. And what's important in the moment, of course, when those field staff are out there, is getting the power back on, not in sort of stopping and conducting a forensic investigation of the site. INTERNATIONAL REPORTING INC. CERTIFIED...

AI summary The discussion focuses on Nova Scotia Power's response to questions about the use of emerging technologies, such as AI, in predicting and managing weather-related outages. The witness acknowledges the importance of restoring power quickly during outages and notes a lack of awareness regarding specific technologies used across the industry for this purpose.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →