Matter: Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)
1 passage 1 document

Energy And Regulatory Boards Act across all matters →

N-6NSPI (NSUARB) RIR-1 to 13 - Redacted 1 passage
Table 8 - Residual Harm from Potential Impacts Associated with the Ruth Falls Dam Refurbishment p. p. 58
Temporary loss of fish habitat (approximately 1.15 km2 ) due to lowering of the reservoir beyond the minimum operating level observed from April 1 – Nov. 30 annually. Lowering the headpond approximately 18' is required in order to complete...

AI summary The temporary loss of fish habitat due to lowering the Ruth Falls Dam reservoir is necessary for refurbishment. NS Power acknowledges the impact and proposes mitigation measures to minimize effects on fish habitat, including a controlled drawdown and maintaining water flow.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →