Topic:"Energy Efficiency Budgets" in M08059

Matter: Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization
11 passages 2 documents

Energy Efficiency Budgets across all matters →

N-1Report 10 passages
Section 43
M Firm Peak with DSM Ref Energy Medium DSM Energy Source: Table 3. Synapse Energy Economics, Inc. NSPI Thermal Generation Utilization and Optimization M08059 13 Final Report Table 3. Peak Load, DSM Contribution, and Annual Energy – Referen...

AI summary The table compares peak load, demand-side management (DSM) contribution, and annual energy usage under reference and medium DSM scenarios from 2018 to 2022. It shows the impact of DSM on firm peak load and annual energy consumption.

Section 91
Build Costs Annualized fixed costs Per assumptions memo (see Table 5 above). Sustaining Capital Costs Annualized fixed costs Per assumptions memo (see Table 6 above). Plexos Production Cost ‐ Fuel, VO&M, FO&M, Startup, and Net Interchange...

AI summary The text discusses the composition of revenue requirements, highlighting that a majority of costs come from fixed and variable operating costs, fuel costs, and Maritime Link Surplus and New Brunswick net imports purchase costs as modeled in Plexos. Maritime Link costs are estimated to account for 14-16% of the total NPVRR and are based on the Maritime Link Interim Cost Assessment case.

Section 92
reflected in the model. Surplus Energy flows over the Maritime Link were modeled within Plexos using market price criteria, and the costs are included as part of the total interchange purchase costs. Sustaining Capital Costs Sustaining cap...

AI summary The document discusses modeling of surplus energy flows over the Maritime Link using Plexos and the inclusion of these costs in interchange purchase costs. It also outlines the method used to estimate sustaining capital costs based on NSPI's 2017 report and how these costs are adjusted in scenarios involving unit retirements. Additionally, it covers reference and medium DSM load scenarios and their impact on energy requirements and cost estimates.

Section 100
requirements to allow for the inclusion of more wind energy on the system. Since this increase in interconnection capacity would extend back into New Brunswick considerably (we assumed a total cost 27 First‐year DSM costs for 2017 were est...

AI summary The text discusses the cost-sharing arrangement for interconnection reinforcement to New Brunswick, estimating first-year DSM costs for 2017 and new build costs for various energy resources. It references modeling by Synapse Energy Economics, Inc. and the use of Plexos for unit commitment and dispatch costs.

Section 104
Final Report Figure 6b. NPV of Revenue Requirements by Scenario and by Component, 2018‐2042, Gas Price Sensitivities and TC3/Tr5 Forced Retirement Sensitivities NPV of Revenue Requirement ($2018 billions ) by Component by Scenario 18.00 Ga...

AI summary The figure presents the NPV of revenue requirements by scenario and component, considering gas price sensitivities and forced retirement sensitivities for Tufts Cove 3 and Trenton 5. It includes various components such as fuel, VOM, RE cost, fixed O&M, and others.

Section 106
st Fuel 4.52 4.03 4.46 4.05 4.44 4.05 3.96 3.62 3.93 3.64 3.69 3.26 4.50 4.08 3.94 3.34 VOM 0.15 0.13 0.15 0.13 0.14 0.13 0.13 0.12 0.12 0.12 0.14 0.12 0.15 0.13 0.13 0.12 RE Cost 3.07 3.07 3.07 3.07 3.07 3.06 3.00 2.98 3.00 2.98 2.99 2.96...

AI summary The text presents a table with various cost categories and their values across multiple years, including fuel, VOM, RE cost, fixed O&M, SustCap, New Build, Inc DSM, NB Transm, NS ML Costs, and ML Surp+NB Imp. The data reflects different cost components and their associated figures.

Section 108
Tufts Cove 3 Trenton 5 Force Retire Original Gas Price Sc 1 TC3 Sc 1 Tufts and Sc 2 TC3 Cove 3 Trenton 5 and Tr5 Sc 1 Low Sc 2 Low Sc 4 Low Sc 13 Low Sc 1 High Sc 4 High Sc 13 High Force Force Force Component Sc 1 Sc 2 Gas Gas Gas Gas Gas...

AI summary The text provides a table comparing various scenarios related to the Tufts Cove 3 and Trenton 5 projects, including fuel costs, variable operating and maintenance (VOM) costs, and renewable energy (RE) costs under different conditions such as low and high gas prices, and a force retire scenario.

Section 114
Retire Retire Fuel 31.0% 29.0% 30.8% 28.4% 29.5% 26.7% 32.6% 31.8% 29.4% 30.7% 30.6% 29.4% VOM 1.0% 0.9% 1.1% 1.0% 1.1% 0.9% 1.0% 1.0% 0.9% 1.0% 1.1% 1.0% RE Cost 21.0% 22.0% 22.1% 22.2% 21.4% 21.2% 19.7% 19.4% 20.3% 21.3% 21.2% 22.1% Fixe...

AI summary The text presents a series of percentages related to various cost components, including fuel, variable operating and maintenance (VOM), renewable energy (RE) costs, fixed operating and maintenance (O&M), sustained capital (SustCap), new build, incremental demand-side management (Inc DSM), New Brunswick (NB) transmission, Nova Scotia Maritime Link (NS ML) costs, and Maritime Link surplus and NB import costs.

Section 149
.8UZxasA. Synapse Energy Economics, Inc. NSPI Thermal Generation Utilization and Optimization M08059 54 Final Report 4. DISCUSSION AND RECOMMENDATIONS 4.1. Discussion Updates Since Technical Conference Additional modeling runs were conduct...

AI summary Synapse Energy Economics conducted additional modeling runs using high and low gas prices, applying a ratio based on US EIA forecasts to NSPI’s delivered price estimates and market costs from New Brunswick and Newfoundland surplus energy.

Section 151
vailable. Nonetheless, our total DSM costs for medium DSM scenarios are increased to ~$410 million (NPV RR), compared to the ~$330 million reported in our Draft Report and at the technical conference. The Draft Report and the technical con...

AI summary The report discusses the correction of a post-processing error in the Draft Report and technical conference slides, which led to an overestimation of DSM costs and NPVRR costs for scenarios with increased wind levels. The correction lowers the NPVRR for these scenarios, but does not affect build/retirement decisions. References are made to Efficiency One's letters regarding Navigant report estimates.

75687Addendum to Final Report - Generation Utilization and Optimization - DSM Avoided Costs 10-24-2018 1 passage
Section 8
493.89 417.07 368.94 304.32 279.56 258.56 322.72 305.85 271.26 265.30 250.78 251.97 239.53 262.26 242.83 227.87 209.53 96.78 Total - Energy basis 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 203...

AI summary The text presents numerical data on avoided energy costs, energy savings (Delta GWh), and cost per MWh (Capacity + Energy) from 2018 to 2042. The note clarifies that avoided costs include emissions costs from Nova Scotia's emission caps, with no additional T or D costs included.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →