Topic/Matter Intersection

Topic:"Energy Efficiency Budgets" in M12149

Matter: Nova Scotia Power Inc. - Investigation arising from Joint Use Agreement between NS Power and Bell Aliant
2 passages 2 documents

Energy Efficiency Budgets across all matters →

N-1Joint Use Agreement between NS Power and Bell Aliant 1 passage
NOTES:
NOTES: - 1.The installation of cable guard over existing customer owned underground power riser systems will not meet standard requirements. - 2.Splicing of secondary power cables shall be carried out in accordance with manufacturer's reco...

AI summary The text outlines specific requirements for the installation and maintenance of power cables, emphasizing compliance with the Canadian Electrical Code and manufacturer guidelines. It specifies that splicing of secondary power cables should only be done as an alternative to pole or conductor replacement, and that the utility must own and maintain all equipment from the splice point to the overhead attachment.

97781NSEB (NSPI) IR - 1 to 15 1 passage
Request IR-3:
Request IR-3: - Please provide an explanation about how NS Power developed the rebate scheme set out in s.2.6 - and 2.12 of the NS Power Regulations and the rationale for such a rebate scheme.

AI summary The request asks NS Power to explain the development and rationale behind the rebate scheme outlined in sections 2.6 and 2.12 of the NS Power Regulations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →