Matter: Nova Scotia Power Inc. - CI C0070486 – HYD Lower Great Brook Stoplog Replacement – $3,593,884
1 passage 1 document

Energy Efficiency Budgets across all matters →

N-1Application - Redacted 1 passage
Why do this project this way? p. p. 8
Why do this project this way? A third-party engineering assessment outlined that the performance issues in removing the stoplogs observed in sluiceway Bays 1 and 6 may be the result of the following, or a combination thereof: - a. Deformat...

AI summary The project involves addressing performance issues in sluiceway Bays 1 and 6 by lowering the water level in Lower Great Brook headpond to 108 ft to safely remove and replace stoplogs. A third-party assessment identified structural deformation and construction discrepancies as potential causes. NS Power obtained a Fisheries Act Authorization to facilitate the drawdown and refurbishments.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →