Reason for Variance The 2025 ACE Plan estimate of $757,358 was a high-level estimate completed before detailed investigation into possible solutions concluded; and, as IPP wind generation is not new, it was assumed an off-the-shelf solutio...
AI summary The 2025 ACE Plan initially estimated a lower cost based on an off-the-shelf solution for wind integration, but the final cost increased significantly due to the need for a customized solution that integrates high wind volume with advanced control capabilities, reflecting a shift in approach.