N-5IESO (IG) RIR 1 to 32 - Redacted 1 passage
Study Type Estimated Number of Studies GIP Amount Deposit Total Notes Representative Projects Anticip p. p. 42
Study Type Estimated Number of Studies GIP Amount Deposit Total Notes Representative Projects Anticipated 2026/27 Feasibility Study 21 $ 15,000 $ 315,000 Green Choice 2 Procurement (9); Additional Capacity Procurement (9); Miscellaneous St...

AI summary The document outlines the estimated number of studies, associated costs, and total funding for various study types, including feasibility and system impact studies, with specific projects anticipated for 2026/27. The total estimated cost is $1,065,000.

N-6IESO (NSEB) RIR 1 to 33 - Redacted 1 passage
Section 79 p. p. 18
- 3 expects to incur costs associated with future energy resource procurement. - 4 (a) Please describe the nature of the capital-related costs expected to be incurred, and estimate 5 in which fiscal year(s) they are expected to be incurred...

AI summary The document outlines questions regarding the nature and timing of capital-related costs for future energy resource procurement by IESO Nova Scotia, whether IESO Nova Scotia intends to build and own energy resources, and how costs will be recovered and allocated. It also references regulatory pathways for NSEB review and approval in 2026.

N-11Evidence of Doane Grant Thornton 1 passage
1 Appendix A - Glossary of terms p. pp. 45-47
1 Appendix A - Glossary of terms Abbreviation Term 2025/2026A 2025/2026 Annualized budgeted expenditures 2025/2026B 2025/2026 budget 2026/2027B 2026/2027 budget Act The More Access to Energy Act AESO Alberta Electric System Operator Applic...

AI summary This glossary defines various terms and abbreviations used in the regulatory proceeding, including financial mechanisms, organizational entities, and procedural terms relevant to energy and regulatory processes in Nova Scotia.

102945Closing Submission - IG 1 passage
5. LACK OF TRANSPARENCY AND ADEQUACY OF EVIDENCE p. p. 14
en documentation; the evidence suggests that key aspects of the account's administration remain unsettled internally at the IESO-NS, irrespective of whether those details have been reduced to writing. Phase II Timeline – An "Aspirational"...

AI summary The document highlights concerns about the lack of transparency and inadequate evidence surrounding the administration of the IESO-NS account and the aspirational timeline for Phase II. The timeline lacks analytical basis and detailed planning, raising questions about the justification for the allocated transition costs and the readiness of the IESO-NS to proceed with Phase II.

102946Closing Submission - IESO 1 passage
297 Undertaking U-7. 298 299 The not-for-profit nature of IESO Nova Scotia is a significant factor that must be taken into 300 account. If IESO Nova Scotia does not have the fundin
14 M12633 Transcript, June 25, 2026, pages 120 - 122. 297 Undertaking U-7. 298 299 The not-for-profit nature of IESO Nova Scotia is a significant factor that must be taken into 300 account. If IESO Nova Scotia does not have the funding to...

AI summary The not-for-profit nature of IESO Nova Scotia is highlighted as a critical factor in its ability to carry out its mandate. The document emphasizes that without proper funding, the IESO would be unable to effectively manage energy system planning, resource procurement, and electricity supply reliability. Mr. Johnston affirms the importance of accurate forecasting in the organization's operations.

20260617-1Hearing Transcript — 06/17/2026 (Johnny Johnston, Chris Milligan, Mike McFeters) 2 passages
IESO NOVA SCOTIA PANEL 65 Cr-ex, (Murphy)
IESO NOVA SCOTIA PANEL 65 Cr-ex, (Murphy) 1 the end of a quarter, there would be some updated 5 for what they were recommending? 6 (Johnston) I believe they must A. 7 have done, but the honest answer is there's an awful lot 8 of water's go...

AI summary The text discusses a regulatory proceeding involving Nova Scotia Power and the benefits package for employees, referencing the More Access to Energy Act and the need for documentation from external consultants regarding salary and benefit recommendations.

IESO NOVA SCOTIA PANEL 81 Cr-ex, (Murphy)
IESO NOVA SCOTIA PANEL 81 Cr-ex, (Murphy) 1 you know, expectation? 7 At the top of the page, it Q. 8 references "Change Management (0.010M)" and it says: 9 10 11 12 13 14 15 16 17 This cost is to support the organization overall with chang...

AI summary The text discusses change management costs associated with transitioning employees from Nova Scotia Power to the IESO Nova Scotia Panel, emphasizing the need for support during the integration process to ensure a smooth transition and proper setup for new staff.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →