Topic/Matter Intersection

Topic:"Energy Efficiency Budgets" in M13007

Matter: Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Fee Recovery Mechanism Application
8 passages 7 documents

Energy Efficiency Budgets across all matters →

N-1Fee Recovery Mechanism Application 1 passage
Preamble p. p. 14
by energy consumption (MWh) provided to IESO Nova Scotia by the LSEs. The Proposed Mechanism uses a combination of a fixed charge and energy consumption as billing determinants. It applies a fixed charge to LSEs, but the fixed charge is al...

AI summary The Proposed Mechanism introduces a fixed charge for energy consumption based on proportional energy served by utilities, aiming to ensure revenue predictability and stability for the ISO, as costs incurred are generally fixed and evenly distributed throughout the year.

N-1-(ii)Appendix 2 - ISO Enduring Fee Cost Recovery Recommendation 1 passage
Section 45 p. p. 29
Note: (1) High renewables criteria based on Nova Scotia's goal for 80% clean electricity by 2030 as described in the Clean Power Plan [(link)](https://novascotia.ca/clean-power-plan/). 36 FTI Consulting LLP, ISO Cost Recovery Mechanism: Ju...

AI summary The document discusses a jurisdictional scan conducted by FTI Consulting LLP for the Nova Scotia Independent Energy System Operator (IESO NS), examining how ISOs charge load-serving market participants. The scan found that most ISOs charge primarily based on energy consumption, with some using peak usage as a determinant.

N-4IESO (IG) RIR 1 to 11 1 passage
Option 1: Energy Allocator p. p. 28
Option 1: Energy Allocator Options Summ ary ¢/kWh Total 19.113 19.857 0.744 3.9% 169.45 176.04 177.73 Total Bill Calculation Customer Charge Fuel-related in aggregate 20.08 80.91 21.04 79.76 21.04 79.76 Non-fuel related in aggregate 88.54...

AI summary This section presents a summary of energy allocation options, including total costs, customer charges, energy charges, and various fees and adjustments. It details the breakdown of fuel-related and non-fuel-related costs, as well as the impact of different programs and charges on the total bill.

N-5IESO (LEI) RIR 1 to 10 1 passage
Terms of Settlement p. p. 31
Terms of Settlement IESO Fee Recovery Settlement Terms fe t he ha is in t ice e re co ve ry m ec n m p ra c o n an S O S fu l ba is ia te I E N t he an nu a s as a p p ro p r r r fe to in t he ha is ag re es re ex am e e re co ve ry m ec n...

AI summary The document outlines the terms of settlement related to IESO fee recovery, including the allocation of fees, responsibilities, and agreements between the IESO, NSP, and other entities. It discusses the mechanisms for fee recovery and the roles of various parties in the process.

N-7IESO (NSEB) RIR 1 to 22 1 passage
Response IR - 2 p. p. 3
Response IR - 2 ISO Core Costs are internal costs such as ISO staff, control room operating and capital expenditures, load forecasting software and running procurement processes. These costs do not include the remuneration of resources for...

AI summary The document outlines ISO Core Costs, which include internal expenses such as staff, control room operations, load forecasting software, and procurement processes. It clarifies that these costs exclude remuneration for ancillary services and transmission or energy balancing costs, which are managed separately by transmission owners.

N-9IESO (IG) RIR 1 Attachments 1 - REFILED 2 passages
- Does not consider cost causality
2.50 Energy Charges $ 2,823,782.06 $ 2,823,782.06 $ 4,9872.50 Energy Charges $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782.06 $ 2,823,782....

AI summary The text presents a detailed breakdown of energy charges and associated costs for various customer categories, including small general, large general, industrial, and extra large industrial customers. The data includes demand charges, energy charges, and illustrative IESO fees, with percentages indicating changes or variations in costs.

Option 5: SLF for Gen , Demand for Tx
Option 5: SLF for Gen , Demand for Tx Options Summary ¢/kWh DSM PCR ¢/kWh 0.657 0.657 0.000 0.0% 887 kWh 5.83 5.83 5.83 DSM BA ¢/kWh -0.024 -0.024 0.000 0.0% kWh - 0.21 - 0.21 - 0.21 Subtotal 0.633 0.633 0.000 0.0% 5.62 5.62 5.62 SCRR ¢/kW...

AI summary The document outlines a detailed cost breakdown for Option 5, including DSM PCR, SCRR, IESO RR, and fuel and non-fuel related costs, with percentages and kilowatt-hour values. It also includes customer charges and energy charges for the Small General Tariff (Standard Offer).

N-10Evidence - LEI 1 passage
4.3 Potential evolution under Phase 2 p. p. 10
4.3 Potential evolution under Phase 2 The MAEA fixes no date for proclaiming the Phase 2 provisions, which come into force only upon proclamation by the Governor in Council. It does, however, require that any ministerial orders transferrin...

AI summary Phase 2 of the More Access to Energy Act (MAEA) will transfer NS Power's operations to IESO Nova Scotia by May 1, 2028, impacting fee recovery and licensing requirements. IESO Nova Scotia will manage the OATT and seek new tariffs from the NSEB, while expanding market participation. The fee recovery mechanism will be re-evaluated once Phase 2 is fully implemented.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →