Topic/Matter Intersection

Topic:"Energy Efficiency Budgets" in M13133

Matter: Nova Scotia Power Inc. - Application for Financing Order authorizing the Securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider
7 passages 3 documents

Energy Efficiency Budgets across all matters →

N-1Application - Redacted 5 passages
Currency: CND p. p. 66
Currency: CND Account Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Total Fuel & PP (Domestic Load Only) Solid Fuel $24,401,261 $26,288,953 $42,933,626 $42,153,676 $35,061,376 $29,631,228 $25,975,941 $...

AI summary The document presents a table showing fuel and power costs for various fuel types across different months, with figures in Canadian dollars. It includes data for solid fuel, natural gas, biomass, bunker C, furnace, diesel, additives, and GHG compliance costs.

INTERIM ENERGY CHARGE p. pp. 107-111
INTERIM ENERGY CHARGE Effective November 1, 2025, in accordance with the Nova Scotia Energy Board (NSEB, Board) Decision[1](#page-111-0) on NS Power's Application for 2025/26 Time-varying Pricing (TVP) Tariffs (M12499): - The Interim Energ...

AI summary The Interim Energy Charge, effective November 1, 2025, applies during both winter and non-winter periods and is set to standard offer rates while system functionality is unavailable. NS Power will notify customers once functionality is restored and will resume approved TVP rates with specific notice periods depending on the restoration date.

ENERGY CHARGE p. pp. 56-183
ENERGY CHARGE cents per kilowatt-hour During a Critical Peak Event For the first 200 kilowatt-hours per month after Critical Peak Event usage For all additional kilowatt-hours Effective November 1, 2026 151.941 16.739 15.331 Effective Janu...

AI summary The Energy Charge table outlines different rates per kilowatt-hour during and after a Critical Peak Event, effective November 1, 2026, and January 1, 2027. A Critical Peak Event is defined as a four-hour period during the Winter Period, between 6:00 AM and 11:00 PM, on any day of the week.

Interim Energy Charge cents per kilowatt-hour During a For the first 200 kilowatt- For all p. p. 79
Interim Energy Charge cents per kilowatt-hour During a For the first 200 kilowatt- For all cents per kilowatt-hour Interim Energy Charge During a Critical Peak Event For the first 200 kilowatt hours per month per maximum demand For all add...

AI summary The document outlines the interim energy charge rates during a Critical Peak Event and for different usage tiers. Rates are set at 14.782 cents per kilowatt-hour for the first 200 kilowatt-hours and 11.718 cents for additional usage, with higher rates effective from November 1, 2026, and January 1, 2027.

AVAILABILITY p. p. 170
AVAILABILITY This tariff is applicable to three phase electric power and energy, supplied at the low voltage side of the bulk power transformer, to municipal electric utilities. Meter readings shall be increased by 1.1% for each transforma...

AI summary The tariff applies to three phase electric power and energy supplied to municipal electric utilities at the low voltage side of the bulk power transformer. Meter readings are adjusted by 1.1% for each transformation between the meter and the low voltage side to account for transformation losses, and readings are reduced when metering is at transmission voltage.

N-3Transcript of Technical Conference held October 15, 2026 1 passage
Section 51
2026. So this would be very - consistent and familiar to most on the call from normal - AA/BA applications. Attachment 1 to that appendix would - include the FAM calculation model. Attachment 2 and - Attachment 3 would be the calculations...

AI summary The document discusses the treatment of the FAM balance, including the calculation model and credit application to customer classes, as well as the deferral treatment of the PHP, which impacts revenue and cost responsibility in generation and transmission functions. Cost allocation methods, such as the 3CP and annual energy requirements, are also outlined.

N-4Proof of Advertisement 1 passage
EVERWIND HIGHLIGHTS TAX REVENUES
EVERWIND HIGHLIGHTS TAX REVENUES Across the data centre and wind projects, EverWind projects more than $400 million in municipal tax revenues over their lifetimes. The company said it is also committing tens of millions of dollars to an in...

AI summary EverWind highlights over $400 million in projected municipal tax revenues from its data centre and wind projects over their lifetimes. The company also plans to invest tens of millions in a community development program. EverWind emphasizes the creation of high-paying, skilled jobs and the combination of energy resources with the knowledge economy to strengthen Nova Scotia's economic resilience.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →