Topic/Matter Intersection

Topic:"Energy Efficiency Codes" in M03632

Matter: BRD-E-R-10 - Renewable Energy Community Feed-in Tariffs (COMFIT)see also M04523
1 passage 1 document

Energy Efficiency Codes across all matters →

20110405-1Hearing Transcript — 4/5/2011 (Synapse Panel, ANSS Panel) 1 passage
Section 60
- We you spoke about, Ms. Shaw, and you used a term yesterday that, I must confess, was the first time I'd ever heard it, you called parasitic you were talking with Ms. Rubin about the estimates that you worked on in connection with the bi...

AI summary The discussion revolves around the term 'parasitic power' used in the context of a biomass facility, which is equated to 'station service.' The conversation explores the composition of station service costs in an oil-fired boiler facility, including components like water feed pumps and cooling water pumps, and estimates the percentage of output these costs represent.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →