3.6 Rescheduled Delivery
p. p. 23
n [3.6(d)](#page-23-2) shall be Scheduled and delivered to NSPI by no later than the date that is 365 days following each applicable Original Date of Delivery; - (d) the Energy delivered by Nalcor to NSPI pursuant to Section [3.6(c)](#page...
AI summary This section outlines the rescheduling and delivery of energy by Nalcor to NSPI, ensuring equivalent economic value through replacement energy supplies and calculation methods based on Incremental Cost Rates.