Topic/Matter Intersection

Topic:"Energy Efficiency Conservation Agreement" in M03632

Matter: BRD-E-R-10 - Renewable Energy Community Feed-in Tariffs (COMFIT)see also M04523
6 passages 4 documents

Energy Efficiency Conservation Agreement across all matters →

B-9Evidence filed by Kwilmu'kw Maw-klusuaqn (KMKNO) 3/18/2011 1 passage
1.2.1 Mi'kmaq Housing Conditions p. p. 19
1.2.1 Mi'kmaq Housing Conditions Issues pertaining to First Nation housing are widespread. Serious problems include: shortages leading to overcrowding; lack of plumbing; no electricity; poor insulation; mould; substandard construction; and...

AI summary The text highlights severe housing conditions in First Nation communities in Nova Scotia, including overcrowding, lack of basic utilities, poor insulation, and structural issues. These conditions are exacerbated by higher rates of overcrowding and substandard housing, which can hinder energy efficiency improvements if not addressed first.

20110404-1Hearing Transcript — 4/4/2011 (Synapse) 1 passage
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MS. RUBIN: So your cost per megawatt
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MS. RUBIN: So your cost per megawatt 1 NSUARB-BRD-E-R.10 Page 137 is lower than plants of the scale 10 times to 20 times 10 assume that that the suitability of the existing system 11 for a 15...

AI summary The discussion centers on the cost per megawatt of a power plant, the reuse of existing piping and valves, and the integration of installed costs for various components of a Combined Heat and Power (CHP) plant. The conversation includes questions about assumptions made in estimating construction costs and whether these costs account for system integration.

20110405-1Hearing Transcript — 4/5/2011 (Synapse Panel, ANSS Panel) 3 passages
Section 60
- We you spoke about, Ms. Shaw, and you used a term yesterday that, I must confess, was the first time I'd ever heard it, you called parasitic you were talking with Ms. Rubin about the estimates that you worked on in connection with the bi...

AI summary The discussion revolves around the term 'parasitic power' used in the context of a biomass facility, which is equated to 'station service.' The conversation explores the composition of station service costs in an oil-fired boiler facility, including components like water feed pumps and cooling water pumps, and estimates the percentage of output these costs represent.

Page 540 NSUARB-BRD-E-R.10
Page 540 NSUARB-BRD-E-R.10 1 don't understand the question. 2 MR. LIVINGSTON: I believe that the 3 regulations in their final form determined that sawmillers 4 and biomass and tidal did not could get the a feed 5 in tariff rate that the Bo...

AI summary The discussion centers on the regulatory treatment of biomass and tidal energy projects, specifically how they differ from wind and hydro projects. The argument is made that sawmills, being integral to local communities, should be included in certain programs, and that these projects can be financed with 100% equity.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS set by the Board; is that possible the way you see it?
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS set by the Board; is that possible the way you see it? 1 NSUARB-BRD-E-R.10 Page 549 MR. TRAVIS: Well, no. I mean, we 1 And I wanted to point that out, that I 2 think St. F.X. certainly does q...

AI summary The discussion revolves around the efficiency of Combined Heat and Power (CHP) systems compared to traditional electricity generation, with stakeholders highlighting the benefits of CHP in terms of overall system efficiency and potential biases in FIT programs that may not fully account for these benefits.

20110407-1Hearing Transcript — 4/7/2011 (Consumer Adv. Panel, Cdn. Wind Energy Panel, EAC - T. Couture) 1 passage
DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS ultimately comes from the manufacturer who'd be using the
DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS ultimately comes from the manufacturer who'd be using the 1 NSUARB-BRD-E-R.10 Page 927 COMFIT structure as a way of testing and demonstrating the 2 technology and being able to say we've instal...

AI summary The discussion revolves around the COMFIT structure as a method for testing and demonstrating renewable energy technology, with a focus on community partnerships and commercial viability. The conversation also touches on ownership and financing arrangements for renewable energy projects.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →