Topic/Matter Intersection

Topic:"Energy Efficiency Conservation Agreement" in M12696

Matter: NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
2 passages 2 documents

Energy Efficiency Conservation Agreement across all matters →

N-2NSPML (BW) RIRs 1-22 - Redacted 1 passage
Preamble p. p. 62
6 NSPML notes there is no flexibility in the Energy & Capacity Agreement in terms of the capacity product, as that product is required during higher load periods in order to support the closure (or avoidance) of a fossil fuel unit. Specifi...

AI summary NSPML emphasizes that the Energy & Capacity Agreement lacks flexibility regarding the capacity product, which is crucial during high-load periods to support the closure of fossil fuel units. NS Power requires the right to access NS Block energy amounts as needed for system requirements.

N-7Evidence - BW 1 passage
Section 246 p. p. 18
- NS Block, measured in MWh (excluding Make-up Energy), is received during each of 12 - consecutive months."[41](#page-18-1) In introducing this requirement, the Board also stated: - NSPML/NS Power may apply to the Board for relief if it c...

AI summary The requirement mandates NSPML to receive twelve consecutive months of NS Block volumes (excluding Make-up Energy) at least 90% of the total monthly volumes called for under the Energy and Capacity Agreement. This prevents over-reliance on Make-up volumes and ensures consistency and predictability in volume delivery.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →