Topic/Matter Intersection

Topic:"Energy Efficiency Financing" in M12969

Matter: Berwick Electric Commission - 2026 Flow Through Application
3 passages 2 documents

Energy Efficiency Financing across all matters →

103154Board Order with updated Schedule A 2 passages
CROSSWALK LIGHTING
CROSSWALK LIGHTING (Crosswalk lighting: fixtures supplied by the Town of Berwick; power, energy and maintenance supplied by the Commission.) 40 watt fluorescent fixture $11.5089 per fixture per month 400 watt fluorescent fixture $45.0058 p...

AI summary The document outlines the costs associated with crosswalk lighting fixtures, specifying that the Town of Berwick provides the fixtures while the Commission is responsible for power, energy, and maintenance. Costs are listed per fixture per month for 40 watt and 400 watt fluorescent fixtures.

55 watt LED yard light $11.9805 per lamp per month
55 watt LED yard light $11.9805 per lamp per month 88 watt LED yard light $16.3823 per lamp per month 125 watt mercury vapour $14.5453 per lamp per month 175 watt mercury vapour $19.4995 per lamp per month 250 watt mercury vapour $24.4756...

AI summary The text presents a table listing various lighting fixtures and their associated monthly costs per lamp. The table includes different wattage options for LED, mercury vapour, high pressure sodium, and metal halide floodlamps, with corresponding cost values.

103154Board Order with updated Schedule A 1 passage
55 watt LED yard light $11.9805 per lamp per month
55 watt LED yard light $11.9805 per lamp per month 88 watt LED yard light $16.3823 per lamp per month 125 watt mercury vapour $14.5453 per lamp per month 175 watt mercury vapour $19.4995 per lamp per month 250 watt mercury vapour $24.4756...

AI summary The document presents a table listing various lighting fixtures along with their corresponding monthly costs per lamp. The table includes different wattage options for LED and mercury vapour lights, as well as high pressure sodium and metal halide floodlamps. This information is likely used for cost analysis or budgeting purposes.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →