Topic/Matter Intersection

Topic:"Energy Efficiency Portfolio Standard Eeps" in M03413

Matter: CI# 39323; CI# 39626; CI# 39627; & CI# 39628 - P-128.10 - NSPI WO - (Digby Wind Project) Application for approval of capital work orders  in the amount of $82.8 million for the acquisition, construction and interconnection of the Digby Wind Farm Project
4 passages 2 documents

Energy Efficiency Portfolio Standard Eeps across all matters →

N-1Application 1 passage
1 DEFINITIONS p. p. 62
ll have the meaning set forth in section 12.5(a). ecoENERGY for Renewable Power Program - means the ecoENERGY for Renewable Power Program established and administered by the Government of Canada. Emission Reductions - mean those benefits r...

AI summary The text defines key terms related to the ecoENERGY for Renewable Power Program and Emission Reductions under a Power Purchase Agreement (PPA). It outlines the scope of emission reductions, including greenhouse gas (GHG) emissions and other specific air emissions, and clarifies that Emission Reduction Credits (ERCs) include various benefits related to these reductions.

N-3-(b)Redacted NSPI Response to UARB IR-12 (att 7-10) to IR-17 3 passages
1 PROJECT SUMMARY p. p. 0
1 PROJECT SUMMARY Project developer SkyPower Corp. (SkyPower) is proposing to construct and operate a wind energy facility located in Digby County in Gulliver's Cove, Nova Scotia (the Digby Wind Power Project; the Project). The Toronto-bas...

AI summary SkyPower Corp. proposes a wind energy project in Digby County, Nova Scotia, with support from Scotian WindFields Inc. and environmental assessment assistance from Jacques Whitford Stantec Limited. The project requires provincial environmental registration under the Nova Scotia Environment Act and federal assessment under CEAA after NRCan's EERP funding approval. DFO's potential regulatory role under CEAA is noted.

- .3 Methane $(CH_4)$ . p. p. 3
- .3 Methane $(CH_4)$ . SkyPower Corporation Digby Wind Power Project Contract 090630.00 Liquid Filled Power Transformers Section 26 12 15 Page 11 June 2009 $\begin{array}{cccccccccccccccccccccccccccccccccccc$ SkyPower Corporation Digby Wi...

AI summary The text discusses the installation and specifications for pad-mounted, liquid-filled, medium-voltage transformers as part of the SkyPower Corporation Digby Wind Power Project. It references various standards and sections related to transformer installation and commissioning.

Preamble p. p. 89
.3 ANSI/IEEE Standards .1 Std 18-1980 IEEE Standard for Shunt Power Capacitors .2 Std C57 Transformers .3 Std C37 Switchgear .4 NEMA Standards .1 CP 1-2000 (R2008) Shunt Capacitors .5 IEC Standards .1 IEC EMC Directive standards and regula...

AI summary The document references various industry standards including ANSI/IEEE, NEMA, and IEC standards related to electrical equipment and systems, such as power capacitors, transformers, switchgear, and EMC directives.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →