Topic/Matter Intersection

Topic:"Energy Efficiency Resource Assessment Model" in M03347

Matter: P-194 - NSPI - 10 Year System Outlook 2010-2019 - June 30, 2010
2 passages 1 document

Energy Efficiency Resource Assessment Model across all matters →

N-110 Year System Outlook 2010-2010 Report dated June 30, 2010 6/30/2010 2 passages
4.2 Changes in Capacity p. p. 1
4.2 Changes in Capacity Table 5 provides the firm Supply and Demand Side Management capacity additions per the Port Hawkesbury (PH) Biomass Project Base Case Plan (as filed with UARB in P-128.10 April 9, 2010) over the 2010-2020 time perio...

AI summary The section discusses changes in capacity, referencing the Port Hawkesbury Biomass Project and its inclusion in the Base Case Plan. It notes the unavailability of the Burnside unit #4 and the assumptions used for wind capacity based on historical and forecasted data.

Preamble p. p. 1
\ DSM Firm does not include interruptible customers \ \ Hydro shown is Marshall at 4.2 MW as per the 2009 Update assumptions. \ \ \ Firm Contracted wind and Nuttby wind reflects the assumed firm capacity contribution based on a combined th...

AI summary The text provides detailed assumptions and calculations related to renewable energy capacity and wind generation, including capacity factors and planning assumptions used in the 2009 IRP Update and the 2015 RES. It outlines how firm capacity is determined based on historical and forecasted data.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →