Topic/Matter Intersection

Topic:"Energy Efficiency Resource Assessment Model" in M03666

Matter: P-188 - NSPI Regulation 3.6 - Net Metering - Request approval of the revised Regulation 3.6Enhanced net metering service, in compliance with recent legislative changes to the Electricity Act.
10 passages 3 documents

Energy Efficiency Resource Assessment Model across all matters →

N-1Letter, Application and Evidence filed by NSPI 11/1/2010 1 passage
31 p. p. 0
31 1 1.0 STATUTORY REQUIREMENTS 2 3 On May 11, 2010, Bill 64, An Act to Amend Chapter 25 of the Acts of 2004, the 4 Electricity Act (the Amended Electricity Act) received Royal Assent. On October 5 15, 2010, the bill was proclaimed in forc...

AI summary This section discusses the statutory requirements introduced by Bill 64, the Amended Electricity Act, which came into force in 2010. It outlines the enhancements to net metering programs, allowing customers to generate renewable electricity and sell excess electricity to the public utility at a rate equivalent to what they pay for electricity.

N-4Submission filed by Mel Whalen, Multeese Consulting Inc., Board Counsel Consultant 2/9/2011 1 passage
Maximum Generating Unit Capacity
Maximum Generating Unit Capacity The Amended Electricity Act specifies a maximum generating unit capacity of 1MW. NSPI proposes to divide this into two classes: - Class 1 up to and including 100Kw - Class 2 100Kw to 1MW NSPI's two-class pr...

AI summary The Amended Electricity Act sets a maximum generating unit capacity of 1MW, which NSPI proposes to divide into two classes. The proposal is based on interconnection standards and aims to simplify the process for smaller generators. Net metering capacity limits are also proposed, with support from the speaker.

N-6NSPI Reply Submission 2/23/2011 8 passages
- 27 filed submissions. p. p. 14
- 27 filed submissions. 1 2.0 REPLY BY NSPI 30 2. The 20 MW distribution capacity limit is appropriate; 31 1 3. NSPI's treatment of potential GHG credits is consistent with the 2 Amended Electricity Act and the UARB's previous decision on...

AI summary The document discusses NSPI's response to submissions regarding the 20 MW distribution capacity limit and the treatment of GHG credits under the Amended Electricity Act. HRWC argues that the amendments do not prohibit multiple meters under different accounts within multiple distribution zones, and that aggregated net metering only requires financial netting, not actual electricity transmission between locations.

HRWC written submission, February 9, 2011, page 3. p. p. 14
HRWC written submission, February 9, 2011, page 3. 1 distribution zone as the net metered generator, are not offset and do not 19 understanding the new legislation, regulations and the Renewable 20 Electricity Plan. NSPI has provided a cop...

AI summary The submission discusses the interpretation of new legislation and regulations related to net metering, emphasizing that the legislative intent allows for net metering of customer accounts within a single distribution zone. It references the Renewable Electricity Plan and the connection of facilities to the distribution grid through a bi-directional meter.

Where We Are Now p. pp. 17-19
Where We Are Now Ageneration ago, Nova Scotia made a deliberate decision to produce electricity from coal. The price was low and stable, and the supply was secure. It was mined right here—so investing in coal-fired generation seemed like a...

AI summary Nova Scotia's reliance on imported coal has led to rising costs, environmental concerns, and economic vulnerability. The Renewable Electricity Plan aims to transition to cleaner, locally produced energy sources, including renewables and natural gas, to ensure affordability, security, and sustainability. The plan builds on previous energy policies and includes input from public consultations led by Dr. David Wheeler.

2. Community-Based Feed-In Tariff p. p. 24
2. Community-Based Feed-In Tariff Small-scale producers typically cannot compete successfully against much larger developers in a competitive bidding process. More than 45 jurisdictions around the world, including Spain, Germany, Ontario,...

AI summary The Community-Based Feed-In Tariff (COMFIT) aims to support small-scale and community-owned renewable energy projects by allowing municipalities, First Nations, co-operatives, and non-profit groups to participate. Projects will be connected at the distribution level, typically under 2 MW, and the program will be reviewed in 2012 to ensure it meets its 100 MW goal.

Achieving the 2020 Goal 5 p. pp. 24-31
Achieving the 2020 Goal 5 The 25 percent commitment established for 2015 will have the force of law, with penalties for any failure to meet it. The 40 percent target for 2020 is a goal we aspire to. It does not yet have the force of law, b...

AI summary The 2015 25% renewable energy commitment is legally binding, while the 2020 40% target is aspirational. The government emphasizes the need for rapid transition to renewable and cleaner energy sources, with flexibility to adapt as technologies evolve. Wind, tidal, and natural gas are highlighted as key resources for meeting these goals.

Preamble p. p. 46
In April 2010, the Government of Nova Scotia released its Renewable Electricity Plan to support and encourage increased development of renewable energy resources for electricity generation. The plan sets out a detailed path for the provinc...

AI summary Nova Scotia's Renewable Electricity Plan, launched in 2010, aims to increase the use of renewable energy sources and reduce reliance on coal. The plan highlights the need to diversify energy sources for energy security and environmental benefits, while also promoting local job creation and economic opportunities in rural areas.

Policy Development and Consideration of Other Regulatory/Legislative Changes p. p. 46
Policy Development and Consideration of Other Regulatory/Legislative Changes The province continues to work on a strategy for cleaner energy, of which the Renewable Electricity Plan is one component. The plan was developed to address renew...

AI summary Nova Scotia is developing a cleaner energy strategy, including the Renewable Electricity Plan and support for energy efficiency. The province explores non-renewable but clean energy sources like waste energy from water pressure reduction and biomass. Efficiency Nova Scotia, an independent agency, will deliver conservation programs, while the government retains funding and design responsibilities. New legislation or regulatory changes may be needed.

COMFIT p. p. 46
COMFIT There was broad support for the COMFIT program and tools to support community-based projects. Several perspectives were presented on how "community" should be defined in order to qualify for the COMFIT. Suggestions ranged from very...

AI summary The COMFIT program received broad support but faced discussions on defining 'community' and expanding technology inclusion. While community involvement was emphasized, broader technology inclusion and business access were not accepted due to cost and capacity concerns.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →