Matter: E-ENS-R-22 - EfficiencyOne - 2022 Rate and Bill Impact Analysis and Model
2 passages 1 document

Energy Efficiency Resource Assessment Model across all matters →

E-12022 Rate and Bill Impact Analysis 2 passages
- values are provided in Table 1, below. p. pp. 11-12
- values are provided in Table 1, below. Table 1: Actual Annual Avoided Cost of Energy Values used for This Analysis Year Actual Annual Escalating Series – AVC – Energy ($/MWh) 2023 $92 2024 $65 2025 $77 2026 $83 2027 $85 2028 $76 2029 $76...

AI summary Table 1 provides actual annual avoided cost of energy values from 2023 to 2040, with specific values listed for each year. Capacity data is also referenced, derived from the recent NS Power 2020 Integrated Resource Plan (IRP).

4 Table 7: Full Range of Avoided Cost Values Used for This Analysis p. pp. 16-19
4 Table 7: Full Range of Avoided Cost Values Used for This Analysis Category Years Details 2011-2014 • 79 $/kW-yr • 2009 IRP refresh (levelized over 2010-2032) Capacity 2015-2022 • 197 $/kW-yr • 2014 IRP, Base DSM scenario (levelized over...

AI summary Table 7 presents avoided cost values for capacity, transmission, distribution, energy, and carbon across different time periods. Values are based on studies like the 2009 and 2014 IRP, and calculations provided by NS Power for the DSMAG. Carbon costs are based on federal trajectories and emissions intensity.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →