Topic:"Energy Efficiency Resource Assessment Model" in M12343

Matter: NSPI Complaint - Power Connection - Roseview Developments Inc.
4 passages 1 document

Energy Efficiency Resource Assessment Model across all matters →

98234Complainant Submission - Nova Scotia Power Inc. Utility Service Requirements 2023 Edition - Effective May 1, 2023 4 passages
7 Large Electric Loads p. p. 11
7 Large Electric Loads Operating large loads such as motors, electric furnaces, electric welders, air conditioners, heat pumps, etc., can produce momentary voltage sag or 'flicker': It is the responsibility of the Customer to ensure that e...

AI summary The document outlines the responsibility of customers to manage large electric loads to minimize voltage sag and flicker. It also emphasizes the need for consultation with the Supply Authority during the design phase to ensure adequate utility supply equipment, with potential charges for rework if this is not done.

14 Services Requiring Primary Equipment p. pp. 16-25
14 Services Requiring Primary Equipment Some larger facilities will require the installation of a transformer that is too large for mounting on a single pole and/or a primary line extension. The customer will be referred to the local Engin...

AI summary This section outlines the requirements for larger facilities needing primary equipment, such as large transformers and primary line extensions. Customers must consult local Engineering or Planning Offices for approval, and developers must engage the Supply Authority for vault requirements. NSPI Standard Drawings are referenced in Appendix B.

NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS p. pp. 97-99
NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS LOCATION OF REMOTE POWER CABINET FOR CATV JIM MCFADGEN, P.ENG FOR NSPI; FOR BELL; STEPHEN CUMMINGER, P.ENG M.HALASZ DRAWN: 2023-02-03 REV DATE: STD NO: J-ED-15M 2 OF 2 SHT: - 1. SERVICE H...

AI summary This document outlines joint-use distribution standards for NSPI and Bell Canada, detailing the installation requirements for remote power cabinets, service attachments, and related components. It includes specifications for materials, clearances, and responsibilities.

NOTES: p. p. 124
NOTES: - A. THE CUSTOMER SHALL BE RESPONSIBLE FOR INSTALLING THE SERVICE ATTACHMENT DEVICE TO THE BUILDING AT THE TIME OF CONSTRUCTION AND ENSURING THE ATTACHMENT WILL SUPPORT A HORIZONTAL LOAD OF 3kN. - B. MATERIAL REQUIRED FOR SERVICE AT...

AI summary The document outlines technical installation requirements for service attachments, including load support, conductor extensions, and clearance specifications. It also references charts and standards for cable sizes and connections, and specifies conditions under which service mast height requirements may be waived.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →