Application for Annually Adjusted Rates for 2026 Redacted 1 LIST OF FIGURES 6 In its Orders dated March 20, 2024 (2024 AAR proceeding)2 and March 25, 2025 (2025 AAR 7 proceeding)3 , the Board issued several directives. The following lists...
AI summary The document outlines directives from the Board's Orders dated March 20, 2024, and March 25, 2025, related to the 2026 AAR application. These directives include developing a time-varying pricing structure, providing sensitivity analyses for wind resource delays, comparing forecasted and actual New Brunswick imports, and explaining the revised One Part Real Time Pricing Tariff.
ENERGY CREDIT The Energy Credit is equal to the average incremental cost of generation as defined under Optional Generation Load Following.
AI summary The Energy Credit is defined as the average incremental cost of generation under Optional Generation Load Following. This definition is illustrated in an accompanying image.
SALES, GENERATION AND DEMAND ANALYSIS FOR THE YEAR ENDING DECEMBER 31, 2026 ( 1) DOMESTIC ( 2) SMALL GENERAL ( 3) GENERAL ( 4) GENERAL LARGE (1) MWH SALES 5,286,337,241 376,992,742 2,308,034,614 363,766,784 (2) ENERGY LINE 8.2% 8.2% 7.9% 5...
AI summary The document provides a detailed analysis of sales, generation, and demand for the year ending December 31, 2026, including metrics such as energy sales, losses, system demand, and contribution percentages across different customer classes.
Annual Peak of ATL 2,356,954 Annual Energy Requirement of ATL 11,303,785,142 System Coincident Load Factor 54.748044% Wind Generation (ERIS) Biomass/ Biogas Other Total Comfit $ $ $ 275,302.28 2,869.65 5,892,525 $ $272,644 $1,439 6,119,648...
AI summary The text provides data on annual peak and energy requirements for ATL, along with detailed tables showing financial figures related to wind generation, imports, exports, and total FAM related costs over various periods.
BTL BUTU GRLF 1P - RTP ELIADC Shore Power EBS Category Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Oct-26 Nov-26 Dec-26 Annual Unmetered 7,158,277 6,891,341 6,911,547 6,769,126 7,135,422 6,913,303 6,921,957 6,602,437 7,2...
AI summary The text presents a table of unmetered energy usage data across different months and an annual total, likely related to energy consumption or production metrics.
ENERGY BALANCING SERVICE TARIFF Page 2 of 3 Renewable to Retail generation adjusted by the deduction of transmission locational losses, as applicable to the geographic zone in which the generating facility is interconnected, over its aggre...
AI summary The Energy Balancing Service Tariff outlines requirements for renewable energy generation and load balancing, including locational loss adjustments, compliance with regulations, and spill capacity approvals by NS Power. The LRS must ensure renewable generation aligns with consumption over a compliance period.
STANDBY SERVICE Standby Service is a supplemental generation capacity service provided to Licensed Retail Suppliers (LRS). The service is provided in combination with Energy Balancing Service under the Energy Balancing Service Tariff. The...
AI summary Standby Service is a supplemental generation capacity service provided to Licensed Retail Suppliers (LRS) in Nova Scotia, consisting of capacity adequacy and top-up capacity components. It is provided alongside Energy Balancing Service under the Energy Balancing Service Tariff and is subject to the LRS Terms and Conditions.
SPECIAL CONDITIONS - (1) The Port Authority owns and is responsible for the maintenance and operation of all electrical equipment required for the supply of port electricity to docked ships other than the meters and metering transformers s...
AI summary The document outlines special conditions for electricity supply to ships at the port, including responsibilities for equipment maintenance, metering arrangements, and power factor requirements. The Port Authority and NSPI have defined roles, and customers may be required to contribute to capital costs for special metering.
STANDBY SERVICE Standby Service is a supplemental generation capacity service provided to Licensed Retail Suppliers (LRS). The service is provided in combination with Energy Balancing Service under the Energy Balancing Service Tariff. The...
AI summary Standby Service is a supplemental generation capacity service provided to Licensed Retail Suppliers (LRS) in Nova Scotia. It includes capacity adequacy service and top-up capacity service, both related to meeting energy balancing obligations and system adequacy standards.
N-14Compliance Filing - Redacted
6 passages
SPECIAL CONDITIONS - (1) The Port Authority owns and is responsible for the maintenance and operation of all electrical equipment required for the supply of port electricity to docked ships other than the meters and metering transformers s...
AI summary This section outlines special conditions related to the provision of port electricity by NSPI to the Port Authority. It specifies responsibilities for equipment maintenance, operational requirements, metering arrangements, and power factor maintenance.
STANDBY SERVICE Standby Service is a supplemental generation capacity service provided to Licensed Retail Suppliers (LRS). The service is provided in combination with Energy Balancing Service under the Energy Balancing Service Tariff. The...
AI summary Standby Service is a supplemental generation capacity service provided to Licensed Retail Suppliers (LRS) in Nova Scotia, consisting of capacity adequacy and top-up capacity components. It is provided alongside Energy Balancing Service under the Energy Balancing Service Tariff and is governed by LRS Terms and Conditions.
The Energy Charge is made up of the following components: Energy Charge Components cents per kWh Fixed Cost Adder from Energy Balancing Service Tariff 2.155 Annually Adjusted Energy Savings Credit 0.000 Annual Energy Cost Adjustment 2.171...
AI summary The Energy Charge comprises several components, including a Fixed Cost Adder from the Energy Balancing Service Tariff, an Annually Adjusted Energy Savings Credit, and an Annual Energy Cost Adjustment, totaling 4.326 cents per kWh. It applies to the Load Serving Retailer's monthly displaced energy on NS Power's generation system, calculated as the total monthly load minus the top-up quantity under the Energy Balancing Service Tariff.
FOR THE YEAR ENDING DECEMBER 31, 2026 (1) MWH (2) ENERGY LINE (3) ENERGY (4) CLASS NON- (5) SYSTEM (6) SYSTEM COINCIDENT COINCIDENT COINCIDENT (7) LINE (8) DEMAND SYSTEM (9) SYSTEM COIN. PEAK COINCIDENT (10) 3CP (11) 3CP SALES LOSSES REQUI...
AI summary The document presents a detailed breakdown of energy sales, losses, and demand factors across various customer classes for the year ending December 31, 2026. It includes data on energy losses, system requirements, and demand factors for different sectors such as domestic, small general, general, large general, small industrial, medium industrial, large industrial, municipal, and unmetered.
Annual Peak of ATL 2,356,954 Annual Energy Requirement of ATL 11,303,785,142 O- 4 0-! 4 1 1 F4 kWh Requirements ATL Classes Domestic Total 707,116,004 662,646,274 625,765,329 481,109,226 389,926,477 315,832,492 344,330,438 345,113,243 297,...
AI summary The document provides data on the annual peak and energy requirements of ATL, along with detailed kWh consumption across various classes such as Domestic Total, Small General, Large General, Small Industrial, Medium Industrial, and Large Industrial. The figures show consumption trends over a period.
STANDBY SERVICE Standby Service is a supplemental generation capacity service provided to Licensed Retail Suppliers (LRS). The service is provided in combination with Energy Balancing Service under the Energy Balancing Service Tariff. The...
AI summary Standby Service is a supplemental generation capacity service provided to Licensed Retail Suppliers (LRS) in Nova Scotia, consisting of capacity adequacy and top-up capacity components. It is provided alongside Energy Balancing Service under the Energy Balancing Service Tariff and is governed by LRS Terms and Conditions.