w and approval). 3 N. Am. Elec. Reliability Corp. , 116 FERC ¶ 61,062, order on reh'g and compliance , 117 FERC ¶ 61,126 (2006), aff'd sub nom. Alcoa Inc. v. FERC , 564 F.3d 1342 (D.C. Cir. 2009). Reliability Standard and Section 39.5(a) o...
AI summary The document outlines NERC's process for filing reliability standards with the NSUARB, including the Memorandum of Understanding between NERC and the Nova Scotia Utility and Review Board, and the subsequent approval of NERC's Reliability Standards by the NSUARB in 2011.
ays applied to the synchronous generator(s), type 1 and type 2 wind resource(s), and synchronous condenser(s). This does not exclude limitations originating in the equipment protected by the relay(s).
AI summary The text discusses the application of certain relay protections to synchronous generators, type 1 and type 2 wind resources, and synchronous condensers, while noting that these protections do not exclude limitations from equipment protected by relays.
Any comments regarding this glossary should be reported to the NERC Help Desk. Select "Standards" from the "Service" drop-down menu and "Other" from the Standards Subcategory drop-down menu. Subject to Enforcement 001 when frequency is gre...
AI summary The text outlines technical terms and definitions related to frequency control and time error correction in the context of the Bulk Electric System (BES), including parameters such as frequency thresholds, binary indicators for interconnected areas, and adjustments for time error corrections.