Topic/Matter Intersection

Topic:"Energy Efficiency Resource Assessment Model" in M12767

Matter: NSPI DRO Appeal - Billing Issues - Briar Mitchell
2 passages 2 documents

Energy Efficiency Resource Assessment Model across all matters →

M-7NSPI (NSEB) RIR-1 to RIR-9 (redacted) 1 passage
Dail / Average Calculations
Dail / Average Calculations . Previous Current Read 112500.4 Read 147480.13 Date 4/1/2025 Date 2/2/2026 Multiplier 1 Difference 34979.75 _ kWhs 34979.75 Days 307 D/A 113.9406 15 Estimated Usage based Bill Date Bill From Bill To # of Days U...

AI summary The text presents a table with energy usage data including dates, kilowatt-hours, and average calculations. It outlines daily energy consumption and estimated usage based on averages over various periods, highlighting differences and multipliers for billing purposes.

103304Board Decision Letter (redacted) 1 passage
Section 5
The Board notes that you purchased the property in March 2025 and that the property utilized radiant heating. The Board further notes that you had been advised during the home purchase process that the property could be expensive to heat a...

AI summary The Nova Scotia Energy Board acknowledges a customer's concern about estimated billing following a cyber incident at NS Power in 2025. The Board explains that estimated billing was used due to the inability to obtain actual meter readings wirelessly, as per approved regulations. The customer purchased a property with radiant heating and is concerned about heating costs and the accuracy of the estimated bills.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →