Topic/Matter Intersection

Topic:"Energy Efficiency Resource Assessment Model" in M12768

Matter: Nova Scotia Power Inc. - Extra Large Industrial Active Demand Control Tariff (ELIADC) - 2025 Annual Report
3 passages 3 documents

Energy Efficiency Resource Assessment Model across all matters →

N-3NSPI (IG) RIR 1 to 15 - Redacted 1 passage
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to IG Information Requests p. p. 13
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to IG Information Requests 1 Request IR-13: 15 (e) In light of this determination, does NSPI plan to modify or enhance any cost or...

AI summary NSPI responded to an information request regarding whether it plans to modify or enhance cost or load tracking practices under the ELIADC or proposed ELID to accurately track hourly load-shifting benefits or costs. NSPI indicated that prior internal discussions with experts suggested the feasibility of a recommendation was questionable, and subsequent attempts to construct software models confirmed it was not feasible.

N-4NSPI (SBA) RIR 1 to 4 1 passage
1 Request IR-1: p. p. 4
1 Request IR-1: 26 reported monthly, quarterly or annually? 27 28 Response IR-4: 29 30 (a) PortOps and associated data inputs, such as PI, were unavailable following the cyber 31 incident, and their full restoration was necessary for calcu...

AI summary The response to Request IR-1 discusses the unavailability of PortOps and related data following a cyber incident, the prioritization of restoring modeling systems, and the anticipated availability of detailed ADC load shifting benefits data for the Q2 2026 FAM Small Working Group meeting.

101622IG (NSPI) IR-1 to IR-15 1 passage
1 2 3 4 2026
(b) Please provide a copy of any FAM SWG presentation materials and 1 2 3 4 2026 M12768 NOVA SCOTIA ENERGY BOARD 2 (c) Does this amount carry interest? If so, who pays? 3 Request IR-5: 4 Reference: 2025 Annual Report, Exhibit N-1, p. 3/9,...

AI summary The document includes requests related to the Fixed Asset Management Stakeholder Working Group (FAM SWG) presentation materials, interest on an amount, and reconciliation of load forecast figures for PHP in 2025. It also asks for the date PHP's initial load forecast was received and the steps taken by NSPI upon receiving revised forecasts.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →