Topic/Matter Intersection

Topic:"Energy Efficiency Resource Assessment Model" in M12915

Matter: NSPI DRO Appeal - Billing Issues - Doug Fulljames and Karen Ward
1 passage 1 document

Energy Efficiency Resource Assessment Model across all matters →

F-2NSPI DRO Decision with Attachments - Redacted 1 passage
Right of access by contractor p. p. 26
Right of access by contractor - 7 (1) A contractor may, at all reasonable times, for the purpose of - (a) inspecting, testing, installing, repairing, removing or changing, when it is lawful for him to do so, any meters, wiring, piping, fit...

AI summary This section outlines the right of a contractor to access a purchaser's premises to inspect, test, install, repair, or change meters and other apparatus related to electricity or gas supply, as well as to measure consumption.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →