Currency: CND
p. p. 66
Currency: CND IPP Master Summary IPP Biomass KWh Taylor Lumber 312,000 448,000 478,000 340,000 370,000 400,507 371,702 365,875 376,108 514,761 471,627 420,628 4,869,208 Calculation IPP Biomass Factor Monthly Allocation 1.2% 6.1% 10.9% 10.4...
AI summary The document presents a summary of fuel costs and load forecasts for various months, including data on IPP biomass kWh, monthly allocation factors, and BTL fuel costs. It includes figures related to the Fuel Adjustment Mechanism (FAM) and load forecasts for different classes of electricity sales.