Topic:"Energy Efficiency Resource Standards" in M03632

Matter: BRD-E-R-10 - Renewable Energy Community Feed-in Tariffs (COMFIT)see also M04523
8 passages 8 documents

Energy Efficiency Resource Standards across all matters →

B-4Redacted Direct Testimony and Exhibits of Paul Chernick - on behalf of CA 3/17/2011 1 passage
EXPERT TESTIMONY p. p. 22
justment and shared-savings incentive mechanisms for Union Gas DSM programs. Standards for review of targets and achievements, computation of lost revenues. Need for DSM expenditure true-up mechanism. 177. NY PSC 99-S-1621; Consolidated Ed...

AI summary The text discusses regulatory proceedings related to energy and utility matters, including DSM programs, rate adjustments, mergers, and asset sales. It references various regulatory bodies and proceedings, focusing on topics such as cost allocation, rate design, and performance-based ratemaking.

B-11Evidence of Alliance of Nova Scotia Sawmillers 3/22/2011 1 passage
III. DESIGN BASIS p. p. 26
III. DESIGN BASIS - Q. Should the facility be designed as a back-pressure or condensing / extracting system? - A. As discussed in the evidence submitted by Synapse, there is no clear definition of CHP provided by NSDOE. We agree with Synap...

AI summary The discussion addresses the design of a facility as either a back-pressure or condensing/extracting system. Synapse's evidence is referenced, noting that sawmills are a reasonable basis for the tariff. A condensing/extracting system is favored due to the variability in steam load from dry kilns and the need for a system that can operate independently, despite higher capital costs.

B-20Undertaking U-10 - Recommended ANSS Rate for Biomass CHP 4/6/2011 1 passage
Scenarios in $2012
Scenarios in $2012 r S On Va lue fo ly tea m- Sh e S d V alu tea are m Gr CH s V alu e f P os or CH Ne t V alu e f P or Annual Hours Operation in Full Condensing (hrs) 2,628 Gross Power Produced (MWh/yr) 6,344 Max. Extraction Mode Max. Ext...

AI summary The document presents data from 2012 scenarios involving a CHP plant's operational parameters, including annual hours of operation, power production, parasitic power requirements, and fuel requirements. The data includes metrics such as gross power produced, parasitic power costs, and fuel heat values.

B-23Renewable electricity Plan - A path to good jobs, stable prices, and a cleaner environment. 4/7/2011 1 passage
Legislation and Regulations p. p. 22
Legislation and Regulations Measures like the creation of the Renewable Electricity Administrator and the implementation of feed-in tariffs require new legislation or amendments to existing laws. - • Amendments to the Electricity Act will...

AI summary The text discusses legislative and regulatory changes required for the creation of the Renewable Electricity Administrator and the implementation of feed-in tariffs. It highlights amendments to the Electricity Act, changes to the Renewable Energy Standard Regulations, and potential new policies for biomass energy emissions control.

07337Board Decision 1 passage
8.1 Submissions p. p. 0
8.1 Submissions [113] Synapse assumed a tariff of $452 per MWh for wind projects of 50 kW or less. This proposed tariff is based on a model project with a single 50 kW (0.05 MW) turbine. [114] Synapse assumed an installed cost of $268,000,...

AI summary Synapse assumed a $452 per MWh tariff for small wind projects (50 kW or less), based on data from developers, manufacturers, and industry associations. Installed costs were estimated at $268,000, with financing at 50:50 debt/equity and a 13% return on equity. A 23% capacity factor was assumed for these projects.

06875Final Submission - Ecology Action Centre 5/2/2011 1 passage
Recommendations:
- 8. This could be otherwise be achieved through an all-technologies, all-renewable aggressive FIT procurement approach for Nova Scotia electricity supplies, versus the marginal success rate of the NSPI RFP process and limited scope of the...

AI summary The EAC recommends a shift to an aggressive FIT procurement approach for renewable energy in Nova Scotia, citing the limited success of the NSPI RFP process and COMFIT. It emphasizes the need for transmission and distribution reforms, and highlights the importance of political will and an enabling environment for policy success.

06890Alliance of Nova Scotia Saw Millers Reply Submission 5/6/2011 1 passage
Delay of Biomass CHP is Not an Option p. p. 0
Delay of Biomass CHP is Not an Option - 2. The EAC has recommended that the Board delay 'the approval of a biomass CHP rate arguing there is "questionable carbon neutrality" and "unresolved provincial biomass policy issues". - 3. The ANSS...

AI summary The EAC has recommended delaying the approval of a biomass CHP rate due to concerns about carbon neutrality and unresolved provincial biomass policy issues. The ANSS argues that the EAC's submission reflects a lack of acceptance of provincial policy and the Renewable Energy Standards. The Board is mandated by the Electricity Act and Renewable Electricity Regulations to establish a biomass CHP tariff, and delay is not an option.

20110405-1Hearing Transcript — 4/5/2011 (Synapse Panel, ANSS Panel) 1 passage
Section 60
- We you spoke about, Ms. Shaw, and you used a term yesterday that, I must confess, was the first time I'd ever heard it, you called parasitic you were talking with Ms. Rubin about the estimates that you worked on in connection with the bi...

AI summary The discussion revolves around the term 'parasitic power' used in the context of a biomass facility, which is equated to 'station service.' The conversation explores the composition of station service costs in an oil-fired boiler facility, including components like water feed pumps and cooling water pumps, and estimates the percentage of output these costs represent.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →