B-3-(i)Appendices - Redacted 1 passage
(1) Usual Load Condition p. pp. 146-147
(1) Usual Load Condition Horizontal Loads Name Pressure (kPa) Force (kN) Moment (kN m) Normal H2O HydrostaticNOL -48.1 -117.8 -192.4 Normal H2O HydrostaticTWN 0.0 0.0 0.0 SoilUpstream Active -23.8 -11.5 -11.1 SoilDownStream At Rest 0.0 0.0...

AI summary The document presents tables detailing horizontal and vertical load conditions for a structure, including forces and moments from various sources such as hydrostatic pressure, soil, ice, and anchor forces. It also includes calculations for factor of safety (FoS) and resultant forces under both usual and no-ice load conditions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →