Matter: CI# 28867 - P-128.10 - NSPI WO - LIN Unit#1 Low Nox Combustion Firing System $3,875,373
3 passages 1 document

Energy Efficiency across all matters →

N-1Non-Confidential Work Order 7/30/2010 3 passages
Section 28 p. p. 1
CI Number 28867-S266 - LIN UNIT#1 LOW NOX COMBUSTION FIRING SYSTEM Project Number S266 ~Parent CI Number Cost Centre 304 - 304-Lingan 1&2 Prod. Unit Budget Version - 2010 06/06 Forecast Forecast Start 10/01/2007 Operational 01/30/2009 Fina...

AI summary This document outlines a project to install a low NOx combustion firing system on Lingan Unit 1, including baseline testing, equipment installation, modifications, and post-outage performance testing. The project was budgeted with costs spanning from 2007 to 2009.

Preamble p. p. 8
Date: 2007/09/24 Page: 1 of 4 CI Number: 28867 - LIN UNIT#1 LOW NOX COMBUSTION FIRING SYSTEM Parent CI Number: Responsibility: 05270000 - GENERATION SERVICES Cost Centre: 304 - Lingan 1&2 Prod. Unit Project Number: Parent Project Number: A...

AI summary This document outlines a project to install a Low NOx Combustion Firing System on Lingan Unit 1&2, including performance testing, equipment installation, modifications, and staff training. The project is part of a capital initiative with a total cost of $4,149,920, to be completed by 2008/12.

Background p. pp. 14-16
Background By 2009, Nova Scotia Power Inc. (NSPI) nitrogen oxides (NO x ) emissions must be reduced to 20% below Year 2000 levels. This is required by an amendment to the Nova Scotia Environment Act (S.N.S. 1994-1995, c.1) (see Appendix I)...

AI summary Nova Scotia Power Inc. (NSPI) must reduce NOx emissions to 20% below 2000 levels by 2009 under the Environment Act . NSPI's program includes installing Low NOx Combustion Firing Systems (LNCFS) on multiple units, with regulatory approvals from the Utility and Review Board (UARB) for retrofits on Lingan Units 3, 2, 4, and others. The text outlines the timeline and compliance measures.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →