GENERAL DEMAND TIME-OF-USE RATE (OPTIONAL) The rate is available to customers meeting the availability criteria of the General Demand rate class who install heat storage systems and controls to enable time shifting of heating and other loa...
AI summary The General Demand Time-of-Use Rate (Optional) is available to customers who install heat storage systems and controls to enable time shifting of heating and other loads. Customers must remain on this rate for one year and may revert to the General Demand rate with one month's notice. Demand charges outside the winter peak period are discounted, and BEC staff may inspect systems to ensure compliance and performance.
125 watt mercury vapour $ 9.50 per lamp per month 175 watt mercury vapour $12.79 per lamp per month 250 watt mercury vapour $15.83 per lamp per month 400 watt mercury vapour $22.54 per lamp per month 70 watt high-pressure sodium lamp $11.1...
AI summary The text presents a table of lighting fixture costs, including mercury vapour, high-pressure sodium, and fluorescent fixtures, with associated monthly costs per lamp or fixture. The crosswalk lighting is managed by the Town of Berwick and the Commission.