Home›Energy Efficiency›M12104›Evidence
Topic/Matter Intersection

Topic:"Energy Efficiency" in M12104

Matter: Riverport Electric Light Commission Complaint - Power Poles - Martin and Wendy Tanner
1 passage 1 document

Energy Efficiency across all matters →

T-3Respondents Submission - Strum Report (redacted) 1 passage
\ \ EXTERNAL EMAIL / COURRIEL EXTERNE \ \
ctrical code standards. Nevertheless, in order to be responsive to its customers' safety concerns, RELC contacted Strum Engineering to assess compliance with the relevant electrical code requirements. Strum reviewed the matter in considera...

AI summary RELC contacted Strum Engineering to assess compliance with electrical code standards regarding high voltage conductor clearances. Strum found no compliance issues, noting that clearances are measured from the conductor toward the building. RELC also states that the deck was built after the distribution lines, so changes to the pre-existing configuration are not required.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →