Matter: To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
8 passages 3 documents

Energy Efficiency across all matters →

N-2NSPI (Midgard) RIR 1 to 14 - Redacted 1 passage
Review of C0051815 - RTU Replacements Program - Phase 6 (NSEB M12550) NSPI Responses to NSEB Information Requests p. p. 82
Review of C0051815 - RTU Replacements Program - Phase 6 (NSEB M12550) NSPI Responses to NSEB Information Requests 1 Request IR-9: 27 (iii) Please provide NS Power's estimate of the additional labour hours and cost 28 attributable to the ch...

AI summary The document outlines NS Power's response to an information request regarding the RTU Replacements Program - Phase 6, focusing on standards, guidelines, and internal procedures applicable to RTU installations in Phase 6 and Phase 1, with specific emphasis on cybersecurity, safety, and quality assurance.

N-3Evidence - Midgard - Redacted 5 passages
LEADERSHIP p. p. 45
LEADERSHIP - Built, managed, and mentored professional teams. - o Team of 10 in Vancouver (Brookfield Renewable Power Inc.). - o Team of 6 in Latvia (Central Bank of the Republic of Latvia). - Crafted and implemented strategic undertakings...

AI summary The document outlines professional experience in leadership roles, including team management, strategic project development, and involvement in industry associations, with a focus on hydro projects and financial risk management.

MIDGARD CONSULTING INC. 2021 - Present p. p. 47
MIDGARD CONSULTING INC. 2021 - Present Consultant, Vancouver BC - Delivered consulting services across the electricity industry to clients including electric utilities, municipalities, First Nations, and renewable energy developers. - Cond...

AI summary Midgard Consulting Inc. has provided consulting services in the electricity industry, focusing on solar photovoltaic systems, financial modeling, and regulatory filings. They have worked with utilities, municipalities, and Indigenous communities, and contributed to expert evidence in various regulatory proceedings.

CANADIAN NUCLEAR LABORATORIES 2018 - 2019 p. p. 47
CANADIAN NUCLEAR LABORATORIES 2018 - 2019 Co-op Student Designer, Chalk River ON - Updated multi-disciplinary technical drawings using AutoCAD software. - Examined technical documentation to extract information on equipment specifications...

AI summary A co-op student designer at Canadian Nuclear Laboratories in Chalk River, ON, updated technical drawings using AutoCAD and examined technical documentation to extract information on equipment specifications and contractual obligations for a construction project.

CAN GROW HERE INC. p. p. 50
CAN GROW HERE INC. Research & Design Associate, Edmonton, AB September 2023 – May 2024 - Performed building energy simulation in TRNSYS and economic feasibility analysis for controlled CEA facility. - Performed modeling in SketchUp, Revit...

AI summary The document outlines the professional experience of CAN GROW HERE INC., including roles in energy simulation, clean energy generation, and research related to energy systems and technologies. The individual has worked on projects involving building energy modeling, techno-economic analysis, and battery electric vehicle charging profiles.

Project Lead Engineer p. p. 57
Project Lead Engineer - Led non-turnkey 1170 MW co-gen power plant. That more than one-billion-dollar project consists of 6 gas turbines, 3 non-fired steam boilers, 3 steam turbines, all auxiliary systems, and 230 substation facilities. -...

AI summary The Project Lead Engineer managed a large non-turnkey co-generation power plant project, including participation in factory acceptance testing and communication with various stakeholders. The project involved significant infrastructure and collaboration with multiple parties.

101123CA (Midgard) IR 1 to 9 - PDF 2 passages
1 Request IR-1:
1 Request IR-1: 2 With respect to Midgard's statement that NS Power's execution strategy uses "sequential 3 execution" (p. 13) and that: 4 5 The installation sequence does not appear optimized to maximize work crew 6 efficiency through pro...

AI summary The document includes a request to Midgard for their opinion on NS Power's execution strategy for the RTU Replacements Program, including the use of sequential execution, phased implementation, and potential cost reductions through earlier filing and operational efficiency improvements.

23 Request IR-5:
sion lines can 45 fluctuate, this typically does not have a material impact on completion timelines or overall 46 cost." (Exhibit N-5, M11458, CA RIR-17) Please provide Midgard's opinion as to whether - 1 the RTU replacement projects can b...

AI summary The text requests Midgard's opinion on whether RTU replacement projects are routine, whether NS Power has sufficient experience with such projects, and whether a risk matrix was reasonably omitted for the Phase 6 project. It also asks whether the risk matrix documentation meets the recommended level of attention to risk factors.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →