Matter: Nova Scotia Power Inc. - Extra Large Industrial Active Demand Control Tariff (ELIADC) - 2025 Annual Report
10 passages 7 documents

Energy Efficiency across all matters →

N-2NSPI (BW) RIR 1 to 10 - Redacted 1 passage
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to BW Information Requests
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to BW Information Requests Request IR-3: 24 increased communication between NS Power ER&M and the Nova Scotia Power System 25 Oper...

AI summary The document discusses NSPI's response to BW information requests regarding the ELIADC Tariff 2025 Annual Report. It outlines increased communication between NS Power ER&M and the NSPSO, collaboration with PHP, and the resumption of day-ahead and real-time schedules following IT system restoration. It also describes the roles of NS Power E&RM and NSPSO in administering the ELIADC Tariff and the suspension of OATT Standards of Conduct during a cyber incident.

N-3NSPI (IG) RIR 1 to 15 - Redacted 3 passages
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to IG Information Requests p. p. 1
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to IG Information Requests 1 Request IR-2: 6 In your explanation, specify when this began and when it concluded. 7 (b) Please deta...

AI summary NSPI responded to information requests regarding the ELIADC Tariff 2025 Annual Report, detailing actions taken after a cyber incident on April 25, 2025, including the use of PortOps and PLEXOS models to optimize PHP load schedules and adjustments made to transmission tariff standards of conduct.

Part C – Conditions p. pp. 9-10
Part C – Conditions - (9) Subject only to reasons of health, safety, environmental, system reliability, and Force Majeure events, PHP must not deviate from the NS Power/NSPSO final demand schedule. NS Power/NSPSO must comply with the weekl...

AI summary Part C outlines conditions for PHP and NS Power/NSPSO regarding compliance with demand schedules, restoration of operations after disruptions, and communication protocols. Deviations from schedules must be tracked and reported, with updates to Appendix 1 filed with the NSUARB.

REDACTED p. p. 13
REDACTED 1 incentive for PHP to follow dispatch and retain its 25 percent share of the ADC Load 2 Shifting Differential. In 2021-2024, the ADC Load Shifting Differential was negative, and 3 therefore no Off-Schedule Charges were applied. 4...

AI summary The document discusses the ADC Load Shifting Differential and Cause Code tracking issues in 2025. It includes financial details related to PHP and requests for information regarding incomplete Cause Code tracking and normalization of data for accurate year-over-year comparisons.

N-4NSPI (SBA) RIR 1 to 4 1 passage
1 Request IR-1: p. p. 4
1 Request IR-1: 27 (a) The current process to determine the generation which served PHP involves running two 28 models in PortOps – one with the system as it ran in actuality ("With PHP"), and a second, 29 modeled system with PHP's load re...

AI summary The current process for determining the generation that served PHP involves running two models in PortOps: one with PHP's load and one without. Running this process multiple times for each Cause Code could create conflicts and invalidate results due to unit start and stop changes. PH Biomass is designated as a must-run unit and remains unaffected in this modeling process.

103394Decision letter 1 passage
M12768 – Nova Scotia Power Incorporated – Extra Large Industrial Active Demand Control Tariff – 2025 Annual Report
M12768 – Nova Scotia Power Incorporated – Extra Large Industrial Active Demand Control Tariff – 2025 Annual Report On March 26, 2026, Nova Scotia Power Incorporated filed its Annual Report on the performance of the Extra Large Industrial A...

AI summary Nova Scotia Power Incorporated filed its 2025 Annual Report on the performance of the Extra Large Industrial Active Demand Control Tariff (ELIADC), which is an annually adjusted, below-the-line tariff serving Port Hawkesbury Paper. The tariff allows NS Power to manage demand in response to system conditions, with savings shared between the company and its customers. However, the ADC load shifting differential was positive in only two years since the tariff's inception.

101622IG (NSPI) IR-1 to IR-15 2 passages
1 2 3 4 2026
(b) Please provide a copy of any FAM SWG presentation materials and 1 2 3 4 2026 M12768 NOVA SCOTIA ENERGY BOARD 18 19 20 (f) Please provide a copy of the process and protocol for load forecast revisions. If there is no written protocol, p...

AI summary The text includes several requests related to forecasting protocols, load forecast divergence impacts, and reconciliation of ELIADC revenue with CBL energy charges and ADC/VOM adjustments. It also asks for FAM SWG presentation materials and a comparison of forecast errors across years.

NSPI has now confirmed:
NSPI has now confirmed: After investigation and internal discussions, NS Power has concluded that it is unable to develop an hourly cost and benefit analysis of all individual Cause Codes. Modeling and isolating the costs and benefits of i...

AI summary NSPI has confirmed it cannot develop an hourly cost and benefit analysis for individual Cause Codes due to limitations in the PortOps software, which leads to conflicting dispatch results and low precision tolerance. The Board is being asked to explain prior assessments, why implementation barriers were not raised earlier, and whether NSPI plans to seek relief or propose alternatives.

102230Submission - BW 1 passage
Section 1 p. p. 0
May 29, 2026 Delivered by e-mail Crystal Henwood Regulatory Affairs Officer/Clerk of the Board Nova Scotia Energy Board 3rd Floor, 1601 Lower Water Street Halifax, NS B3J 3S3 Vincent Musco Bates White Economic Consulting Via e-mail Subject...

AI summary This document discusses the 2025 Annual Report on the ELIADC Tariff by Nova Scotia Power, Inc. It highlights that the actual cost to serve Port Hawkesbury Paper was below the forecasted cost, resulting in a positive ADC differential. The report also notes that PHP's load was 15% below its forecast due to challenges in forecasting energy demand in the paper market.

102307Reply Submission - PHP 1 passage
Section 2 p. p. 0
ere is no cause for concern. There were 95 total Cause Code 5 hours, or only 1.1% of all hours in the year, which as Bates White notes was the second lowest total of the six years of Tariff operation. The IG submits on page 2 that "the abs...

AI summary The text discusses the low occurrence of Cause Code 5 hours, the IG's concerns about load forecast revisions and interest on post-year-end balances, and stakeholder requests for transparency and improved reporting on the ELIADC Tariff. NS Power is responsible for providing updates and addressing audit recommendations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →