REDACTED p. p. 2
d. The resulting true-up bill reflected total actual consumption of 13,836 kWh for the period from December 31, 2025 to February 25, 2026. Relevant bills are included as Confidential Attachment 3 . On April 20, 2026, NS Power's Measurement...

AI summary The document details a true-up bill for 13,836 kWh, confirms meter accuracy via Measurement Canada, and outlines NS Power's limited role in consumption factors. NS Power offers a payment plan and refers customers to Efficiency Nova Scotia for energy reduction guidance. Confidential attachments and a fee structure for retesting are included.

S-6NSPI (NSEB) RIR-1 to RIR-3 (redacted) 1 passage
REDACTED
REDACTED 1 for a 10-year certification period. Based on NS Power's meter certification 2 schedule, meter #2567965 is not due for recertification testing until April 2, 2035. 3 4 (g) NS Power can generally arrange for a meter to be removed...

AI summary The text discusses the recertification schedule for a specific meter, noting that it is not due for testing until 2035. It also outlines the timeframes for meter removal, submission for testing, and reporting of results. Additionally, it references a regulatory proceeding involving NSPI and the NSEB.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →