The purpose of the NS Power's wildfire mitigation plan is to reduce the risk of wildfires caused by electrical infrastructure in Nova Scotia and to protect public safety. It aims to ensure the reliability of electricity services by impleme...
AI summary NS Power's wildfire mitigation plan aims to reduce wildfire risks from electrical infrastructure, protect public safety, and enhance grid resilience through vegetation management, equipment upgrades, and operational improvements.
6.5 Proactive De-energization (Public Safety Power Shutoff) NS Power is required to ensure the safe operation of the transmission and distribution system and has the authority to interrupt circuits for various public safety risks, includin...
AI summary NS Power has the authority to de-energize circuits for public safety, including during wildfires, and has done so in coordination with emergency management. While PSPS is used by some utilities, NS Power has not yet determined if it is appropriate for Nova Scotia, considering local conditions and potential impacts on customers.