Home›Energy Efficiency›M13125›Evidence
Topic/Matter Intersection

Topic:"Energy Efficiency" in M13125

Matter: Nova Scotia Power Inc. - CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI C0040106 – HYD Tusket Unit 1 Generator Refurbishment - $2,331,683
3 passages 2 documents

Energy Efficiency across all matters →

N-1CI 49595 – HYD Tusket Unit 1 Overhaul - Application - Redacted 2 passages
CI 49595 Attachment 1 Page 27 of 28 REDACTED (CONFIDENTIAL INFORMATION REMOVED)
CI 49595 Attachment 1 Page 27 of 28 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Kaplan Turbine - Pitch Operation mechanism \ These pictures are unit 3 All units are the same from a visual standpoint. Gov-Oil pressure tank needs inspection…...

AI summary The text discusses the Kaplan Turbine's pitch operation mechanism and notes that the Gov-Oil pressure tank requires inspection and replacement, with all units being visually identical.

15. Nuclear and Medical End-use
15. Nuclear and Medical End-use GOODS, FIRMWARE, SOFTWARE, DOCUMENTATION, SERVICES AND THE PRODUCTS OF SERVICES SUPPLIED UNDER THE CONTRACT MUST NOT BE USED IN CONNECTION WITH ANY MEDICAL, LIFE-SUPPORT OR RELATED APPLICATIONSUNLESS OTHERWI...

AI summary The text outlines restrictions on the use of goods, software, and services under a contract, specifically prohibiting their use in medical, life-support, or nuclear-related applications unless a written agreement is in place. It also requires the customer to defend and indemnify Emerson and its affiliates from any claims arising from such use.

N-2CI C0040106 – HYD Tusket Unit 1 Generator Refurbishment - Application - Redacted 1 passage
Voith Hydro
Voith Hydro Customer: Nova Scotia Power KV: 6600 Site: Tusket Rating: 900 KVA Unit: 1 Number of Slots: 0 Job Number: 0 Sidepacking Type: 0 Cuts Ref: 0 Coil Type: Multi Turn Work Scope: Test and Inspect Insulation: 0 Machine: Vertical STATO...

AI summary The document outlines an inspection checklist for a generator unit at the Tusket site, operated by Nova Scotia Power, focusing on the stator core, fingers, endplates, core studs, and frame joints. The inspection details the condition of various components and includes notes on observations such as 'some wave' on the back side of the core.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →