After discussing building schedules, the site contact provided a set of building plans for review. The main floor plans, as well as the building elevations, were subsequently used to dimension the building model. The reviewed plans also co...
AI summary The document describes the process of creating baseline and as-built building models using eQuest and DOE2.2 software. It outlines the use of building plans, HVAC parameters, and adjustments made to model ground source heat pumps as chillers due to software limitations.
s shut off for 1,512 hours during the winter. Free cooling operation is a weather variable and will shut off the condensing unit when outside air temperatures drop below the temperature in the cooler. 5.0 On-Site Methodology The evaporator...
AI summary The document describes the on-site methodology used to observe and record data on evaporators, condensing units, and door heaters in stores located in Truro and Dartmouth. The store managers were interviewed to gather information on the performance of new equipment and baseline operations, including observations on free cooling and the operation of outside air dampers.