ving the ground loop, hot water loop, and chilled water loop. Other plan details, such as the locations of HRVs and fan coils, were also verified to ensure that the building would be modeled properly. 6.0 On-site Observations and Findings...
AI summary The document describes on-site observations and findings related to the installation of heat pumps and other energy efficiency measures in a building. Occupancy sensors and heat pumps were installed as proposed, but the insulation measures could not be verified due to completed construction. Occupancy, lighting, and HVAC scheduling data were provided to assist in constructing a new energy model.