Notation Scenario Name Load Capital CapCredit NB Trans RetirePath
which use 0% capacity contribution for ERIS resources, and 17% for NRIS resources), and using 20% of the installed capacity of all wind as a capacity contribution for alternative scenarios. These values could also be tested as a sensitivit...
AI summary The analysis explores capacity contribution scenarios for wind resources, retirement paths for coal and Tufts Cove 1 plant units, and sensitivity testing of input assumptions. It outlines alternative capacity expansion paths and modeling variables, including fuel and import costs, within the PLEXOS system.