Topic/Matter Intersection

Topic:"Energy Management Information Systems" in M08059

Matter: Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization
1 passage 1 document

Energy Management Information Systems across all matters →

N-1-(i)Generation Utilization and Optimization Final Report Appendices 5.1, 5.2 and 5.3 - Synapse 1 passage
Notation Scenario Name Load Capital CapCredit NB Trans RetirePath
which use 0% capacity contribution for ERIS resources, and 17% for NRIS resources), and using 20% of the installed capacity of all wind as a capacity contribution for alternative scenarios. These values could also be tested as a sensitivit...

AI summary The analysis explores capacity contribution scenarios for wind resources, retirement paths for coal and Tufts Cove 1 plant units, and sensitivity testing of input assumptions. It outlines alternative capacity expansion paths and modeling variables, including fuel and import costs, within the PLEXOS system.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →