Matter: To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
1 passage 1 document

Energy Management Information Systems across all matters →

N-7Rebuttal Evidence - NS Power 1 passage
16 Exhibit N-3, Midgard Evidence, February 18, 2026, page 39, lines 4-5.
16 Exhibit N-3, Midgard Evidence, February 18, 2026, page 39, lines 4-5. 1  SM Electrician 2 Install RTU hardware and power up RTU o 3 Install wiring for RTU and field devices o 4 5  Engineering 6 Prepare SCADA drawings o 7 Update existi...

AI summary The text discusses the technical complexity and sequential nature of RTU replacement, arguing that Midgard's recommendation for a 30% reduction in installation time is not technically supportable due to underestimation of duration, site-specific complexity, and misallocation of travel time and engineering requirements.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →