N-1Application - Redacted 1 passage
Section 81
eliver and manage data integrations in a more timely and cost effective manner. C0047278 IT - Oracle MDM Upgrade 4,684,089 7,949,409 The Meter Data Management (MDM) System is nearing end-of-life and requires an upgrade to maintain vendor s...

AI summary The text discusses the need to upgrade the Meter Data Management (MDM) System and the Advanced Distribution Management System (ADMS) to ensure vendor support, cybersecurity, and compatibility with emerging technologies. These upgrades are part of the 2026 ACE Plan and involve significant financial investments.

N-3NSPI (CA) RIR 1 to 32 - Redacted 2 passages
CONFIDENTIAL (Attachment Only) p. p. 26
CONFIDENTIAL (Attachment Only) 1 necessary to account for the potential additional costs associated with potential, necessary 3.7 Mass of Core and Coils - kg 21000 3.8 Mass of Tank and Fittings - kg 12500 Oil Mass 3.9 - kg 14000 Oil Volume...

AI summary The text provides technical specifications for a transformer, including details on mass, oil type, noise levels, and bushing parameters. It includes information about the core, coils, tank, and various components of the transformer, such as cooling fans and bushing ratings.

2026 Annual Capital Expenditure (ACE) Plan (NSEB M12619) NSPI Responses to Consumer Advocate Information Requests p. pp. 26-69
2026 Annual Capital Expenditure (ACE) Plan (NSEB M12619) NSPI Responses to Consumer Advocate Information Requests 1 Request IR-23: 25 (e) Yes, NS Power does believe that creating distance between the treeline edge and power 26 lines will c...

AI summary NSPI responds to information requests regarding the 2026 Annual Capital Expenditure (ACE) Plan. It discusses the effectiveness of vegetation management in reducing outages, the coding of outage events, and the use of frontline employee data for decision-making.

N-6NSPI (NSEB) RIR 1 to 202 - Redacted 1 passage
7 p. p. 72
7 Year SAIDI All-In SAIDI MED Excluded Resilience Gap 2 3 Directives & Misc pages 87 to 141 4 5 Section 11.1.4 Impact of Reliability Projects pages 92 to 132 6 7 Page 100 of the application discusses the metrics and the measure of Reliabil...

AI summary The document discusses the use of Reliability Cost Efficiency (RCE) as a metric to evaluate risk mitigation strategies for improving reliability in the electricity grid. An example is provided where NS Power considers options like strategic undergrounding or vegetation management for a rural feeder section with increased circuit risk. The RCE metric is not the sole criterion for project selection but is used to refine the choice of interventions.

20260421-1Hearing Transcript — 04/21/2026 (Revised Transcript - Refiled May 20, 2026) 1 passage
NS POWER PANEL 139 Cr-ex, (Powell)
NS POWER PANEL 139 Cr-ex, (Powell) 1 momentary versus the impact of a sustained, we'll have 3 (MacMullin) I believe so. A. 4 Q. Please can we have it for 5 previous years? 6 THE CHAIR: That's not we need 7 MS. POWELL: So earlier in this le...

AI summary The transcript discusses a question regarding the calculation of a metric and the level of detail available in data reporting, specifically addressing circuit level data and its relation to customer rate classes. The discussion also touches on the availability of historical data for analysis.

20260422-1Hearing Transcript — 04/22/2026 (Revised Transcript - Refiled May 20, 2026) 1 passage
Preamble
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS 1 make sure I understood that. 2 So which years are you talking about 3 when you're talking 80 and 70? 4 MS. MacMULLIN: Sure. In 2024, we 5 would have had higher number of wind gusts o...

AI summary The text discusses wind gust measurements in 2024 compared to 2021, noting higher wind gusts over 80 in 2024. These measurements are taken at representative stations and are used as an indicator of system intensity and operating conditions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →